Eagar, AZ · Apache County

No notary required

Application for Manufactured Home Placement

This application is for homeowners seeking to install a manufactured home in Eagar and must be returned with required drawings to the Building Department.

What this form is

The application collects owner and installer details, home size and valuation, proposed use, job-site location, and utility information for a manufactured home setup. Applicants must include a plot plan and required information about the home; a septic permit is required if the property is not on the Town of Eagar sewer system. Older homes that do not meet the stated snow-load requirements may also require a completed release of responsibility.

Who needs it

Homeowners applying to install a manufactured home in Eagar must complete the application and provide the required drawings and supporting information.

How to submit it

Return the application along with required drawings to the Building Department. For an applicable completed release of responsibility, the document says to return it to the Town of Eagar, P.O. Box 1300, Eagar, AZ 85925, after recording.

About notarization

This application is signed and dated without a notary; the related release of responsibility must be signed and recorded, but the document does not say it requires notarization.

How to submit this form

  1. 1

    Download the Application

    Download the Town of Eagar application for manufactured home setup.

  2. 2

    Complete the Application

    Provide the requested owner, installer, home, job-site, proposed-use, and utility information.

  3. 3

    Gather Required Drawings

    Prepare a plot plan showing the home, property lines, outbuildings, and current and proposed utilities.

  4. 4

    Submit to the Building Department

    Return the completed application with required drawings to the Building Department.

Frequently asked questions

Do I need a notary for the manufactured home placement application?
No. The application is signed and dated without a notary. A related release of responsibility must be signed and recorded, but the document does not state that notarization is required.
How do I submit the manufactured home placement application?
Return the application with the required drawings to the Building Department. The document does not provide a department address or email for this application.
What should I include with the application?
Include a plot plan showing the home, property lines, outbuildings, and utilities, along with the requested home details. A septic permit from Apache County is required if the property is not on Town of Eagar sewer.
Who completes the manufactured home placement application?
The application requests information from the owner and installer, including contact details, contractor license information, home specifications, job-site location, and utility information.

Need something notarized?

This Application for Manufactured Home Placement doesn’t need a notary — but if you have another Eagar form that does, a commissioned online notary can help.