Lake Havasu City, AZ · Mohave County
General Right-of-Way Permit
This application requests a permit for work in a public right-of-way and is completed by the applicant or permittee responsible for the proposed work.
What this form is
Use this application to request permission to perform work in a public right-of-way, such as grading, landscaping, installing concrete or pavers, or other listed work. It asks for the work location, applicant, property owner and contractor details, a description of the work, and the applicant’s signature. The conditions also call for plans and other project materials with the application.
Who needs it
Applicants seeking to perform work in a Lake Havasu City public right-of-way or easement need this permit application.
How to submit it
Submit the application to the Development Services Department at 2330 McCulloch Blvd N, Lake Havasu City, AZ 86403, or email it to [email protected]. The form requires two sets of plans and lists additional project materials in its general conditions.
About notarization
This application is signed without a notary; it requests a signature and date, or a typed electronic signature, and identifies no notarized attachment or sworn step.
How to submit this form
- 1
Download The Application
Download the General Right-of-Way Permit application.
- 2
Complete The Application
Fill in the work location, applicant, property owner, contractor, and proposed work details; sign and date the application.
- 3
Gather Project Materials
Include two sets of plans and the project materials identified in the general conditions, such as a traffic control plan and pre-construction photos.
- 4
Submit To The City
Send the application to Development Services at the listed address or email [email protected].
Frequently asked questions
- What is the General Right-of-Way Permit application for?
- It requests a permit to perform work in a public right-of-way or easement, including listed work such as grading, landscaping, and concrete or paver installation.
- Who completes this application?
- The applicant or permittee seeking permission for the proposed right-of-way work completes the form and provides project, property, and contractor information.
- Do I need a notary for the General Right-of-Way Permit application?
- No. The application requests a signature and date, or a typed electronic signature; it identifies no notarized attachment or sworn step.
- How do I submit the General Right-of-Way Permit application?
- Submit it to Development Services at 2330 McCulloch Blvd N, Lake Havasu City, AZ 86403, or email [email protected]. Include two sets of plans.
Need something notarized?
This General Right-of-Way Permit doesn’t need a notary — but if you have another Lake Havasu City form that does, a commissioned online notary can help.
