Snowflake, AZ · Navajo County

No notary required

Manufactured Home Permit Application

Snowflake’s Manufactured Home Permit Application collects project, applicant, home, dealer, installer, utility, and setup details for a manufactured home installation.

What this form is

The application is for placing a manufactured home in Snowflake or relocating one within town limits, where the document says a manufactured home permit is required. It asks for the project address, parcel and building permit numbers, applicant contact information, home specifications, dealer and installer details, utility access, and setup type. Its checklist also calls for a location map and a site plan pre-approved by the Town.

Who needs it

Residents or contractors placing a manufactured home in Snowflake or relocating one within town limits should use this permit application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application does not require a notary; it asks for an affidavit of affixture after installation but does not state that the affidavit must be notarized.

How to submit this form

  1. 1

    Download The Application

    Download the Manufactured Home Permit Application PDF.

  2. 2

    Complete The Application

    Provide the project, applicant, manufactured home, dealer, installer, utility access, and setup information requested.

  3. 3

    Gather The Map And Site Plan

    Prepare a detailed hand-drawn location map showing nearest major intersections and obtain Town pre-approval for the site plan.

  4. 4

    Submit The Application

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Manufactured Home Permit Application?
No. The application does not require a notary. It asks for an affidavit of affixture after installation but does not say the affidavit must be notarized.
How do I submit the Manufactured Home Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
What should I include with the application?
The checklist calls for a detailed hand-drawn map of the installation location showing nearest major intersections and a site plan pre-approved by the Town of Snowflake.

Need something notarized?

This Manufactured Home Permit Application doesn’t need a notary — but if you have another Snowflake form that does, a commissioned online notary can help.