Antioch, CA · Contra Costa County

No notary required

Wireless Small Wireless Facility Administrative Use Permit Application

Wireless applicants use this application to request an administrative use permit for constructing, installing, modifying, relocating, or deploying a small wireless facility in Antioch.

What this form is

The City requires an administrative use permit for requests to construct, install, attach, operate, collocate, modify, reconstruct, relocate, or otherwise deploy small wireless facilities in Antioch. Applicants submit the application online with materials that include owner authorization, a project description, construction drawings, and technical reports. The checklist also identifies additional materials that may apply based on the project site and proposal.

Who needs it

Applicants proposing to deploy a small wireless facility in Antioch need this application and the supporting materials listed in its submittal checklist.

How to submit it

Submit the application online through the EnerGov/EPL City of Antioch Civic Access Portal. Wireless applications are accepted Monday through Wednesday before 3 p.m. Pacific Time on working days.

About notarization

This application is signed without a notary; its listed Property Owner Authorization and Statement of Understanding attachments have no notarized or sworn step stated.

How to submit this form

  1. 1

    Download the Application

    Download the wireless small wireless facility administrative use permit application and review its process and submittal checklist.

  2. 2

    Complete the Application

    Prepare the application and a detailed written project description explaining the design intent and proposed project.

  3. 3

    Gather Supporting Materials

    Collect the checklist materials that apply, including owner authorization, construction drawings, reports, photos, and public notices.

  4. 4

    Submit to the City

    Submit online through the EnerGov/EPL City of Antioch Civic Access Portal, Monday through Wednesday before 3 p.m. Pacific Time on working days.

Frequently asked questions

Do I need a notary for the Wireless Small Wireless Facility Administrative Use Permit Application?
No. This application is signed without a notary. The listed Property Owner Authorization and Statement of Understanding attachments do not state a notarized or sworn step.
How do I submit the wireless facility permit application?
Submit it online through the EnerGov/EPL City of Antioch Civic Access Portal. Wireless applications are accepted Monday through Wednesday before 3 p.m. Pacific Time on working days.
What materials accompany the application?
The checklist includes owner authorization, a fee, a project description, construction drawings, and other materials such as reports, photos, and public notices. Requirements vary with the proposal and site.
Is a pre-application conference required?
No. The City strongly encourages a voluntary pre-submittal conference, but does not require one. The form says preliminary plans are needed to schedule a pre-application meeting.

Need something notarized?

This Wireless Small Wireless Facility Administrative Use Permit Application doesn’t need a notary — but if you have another Antioch form that does, a commissioned online notary can help.