Moraga, CA · Contra Costa County

No notary required

SB 330 Preliminary Application

Residential and mixed-use project applicants use this Town of Moraga application to submit preliminary project information and plans under the Housing Crisis Act.

What this form is

The application begins preliminary review of a residential or mixed-use project and includes a submittal checklist describing the required forms, plans, and other materials. It asks for project, applicant, owner, consultant, and development information, along with signatures and an indemnification agreement. The document also describes an initial deposit and circumstances in which the preliminary application may expire.

Who needs it

Applicants seeking preliminary review of a residential or mixed-use project in Moraga should complete this application and provide the required plans and supporting materials.

How to submit it

Submit three copies of written documentation, three copies of a 24-by-36-inch plan set, and one electronic submittal on a USB flash drive. The form lists the Planning Department at 329 Rheem Boulevard, Moraga, CA 94556, and [email protected].

About notarization

This document is signed without a notary; the applicant and, when applicable, property owner sign and date the application and agreement.

How to submit this form

  1. 1

    Download The Application

    Download the SB 330 Preliminary Application PDF and its submittal checklist.

  2. 2

    Complete The Application

    Provide the requested property, applicant, owner, consultant, and project information, and sign and date the application and agreement.

  3. 3

    Gather Required Materials

    Prepare three copies of written documentation, three copies of a 24-by-36-inch plan set, and one electronic submittal on a USB flash drive.

  4. 4

    Submit To The Town

    Submit the application and required materials to the Town of Moraga Planning Department using the contact details listed on the form.

Frequently asked questions

Do I need a notary for the SB 330 Preliminary Application?
No. This document is signed without a notary; the applicant and, when applicable, property owner sign and date the application and agreement.
Who uses the SB 330 Preliminary Application?
Applicants submitting a preliminary application for a residential or mixed-use project under the Housing Crisis Act use this form and its submittal checklist.
What materials must I submit with the application?
The checklist calls for three copies of written documentation, three copies of a 24-by-36-inch plan set, and one electronic submittal on a USB flash drive.
How do I submit the SB 330 Preliminary Application?
Submit the required copies and USB flash drive to the Town of Moraga Planning Department. The form lists 329 Rheem Boulevard, Moraga, CA 94556, and [email protected].

Need something notarized?

This SB 330 Preliminary Application doesn’t need a notary — but if you have another Moraga form that does, a commissioned online notary can help.