Orinda, CA · Contra Costa County

No notary required

Revocable Encroachment Permit

Orinda applicants use this permit form to request authorization for work in the public right-of-way and provide details about the applicant, location, and proposed work.

What this form is

The City of Orinda Public Works Department uses this permit for work in the public right-of-way. Applicants provide contact information, the property owner and work location, a description of the work, and planned work dates; the permit includes conditions and spaces for signatures and approval. Applications for listed streets with restricted working hours must be submitted at least 21 calendar days before the proposed start of work.

Who needs it

A person or contractor planning work in Orinda’s public right-of-way needs this permit and must complete the applicant sections.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. For listed streets with restricted working hours, submit at least 21 calendar days before the proposed start of work.

About notarization

This permit is signed and dated without a notary; the form does not require a notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Permit

    Download the Revocable Encroachment Permit PDF.

  2. 2

    Complete Applicant Sections

    Type or print in block letters and complete all double-underlined sections, including the work location and description.

  3. 3

    Gather Required Materials

    Check the special requirements and instructions to determine whether plans or a traffic control plan are required.

  4. 4

    Submit To The City

    Submit the permit to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Revocable Encroachment Permit?
No. The permit is signed and dated without a notary, and the form does not require a notarized or sworn attachment.
How do I submit the Revocable Encroachment Permit?
Submit it to the city department named on the form; check the city website for current contact details. Listed restricted-hour streets require submission at least 21 calendar days before work begins.
What information does the permit ask for?
It asks for applicant and property owner details, the work location, a description of the work, planned dates, and other project information.
When should I arrange an inspection?
The permit says to call (925) 766-5757 at least 48 hours before starting or resuming work.