Kerman, CA · Fresno County

No notary required

Application for Reroof

This application requests a building permit for reroofing and is completed by the property owner or contractor with details about the roof, project, and required certifications.

What this form is

Use this application to request a building permit for a reroofing project in Kerman. It asks for property and project details, roofing materials, contractor or owner-builder information, and required declarations and signatures. The packet also includes cool-roof compliance information and a homeowner clearance form for residences with an existing rooftop solar photovoltaic system; the clearance must be submitted before the reroof permit can be issued.

Who needs it

Property owners or contractors applying for a reroofing permit need this form, and homeowners with existing rooftop solar must complete the included clearance form.

How to submit it

The form says the homeowner solar clearance must be submitted to the Building Department before permit issuance. The Building Division address listed is 850 S Madera Ave, Kerman, CA 93630.

About notarization

This document is signed without a notary; contractor and owner-builder declarations are made under penalty of perjury, and the other listed certifications require signatures and dates.

How to submit this form

  1. 1

    Download the Application

    Download the Application for Reroof and review the application and included forms.

  2. 2

    Complete the Project Details

    Enter the property, reroof, roofing material, owner, and contractor information requested on the form.

  3. 3

    Complete Applicable Declarations

    Complete and sign the applicable contractor, worker’s compensation, owner-builder, and cool-roof sections.

  4. 4

    Complete Solar Clearance If Needed

    If the residence has an existing rooftop solar photovoltaic system, the homeowner must complete and sign the clearance form.

  5. 5

    Submit to the Building Department

    Submit the completed application to the Building Department; submit the homeowner solar clearance before the reroof permit can be issued.

Frequently asked questions

Do I need a notary for the Application for Reroof?
No. The document has no notary block; contractor and owner-builder declarations are made under penalty of perjury, and the other certifications require signatures and dates.
Who completes the Application for Reroof?
The property owner or contractor applying for a reroof permit provides project details and completes the applicable declarations and certifications. A homeowner with an existing rooftop solar system must also complete the included clearance form.
How do I submit the Application for Reroof?
The form says the homeowner solar clearance must be submitted to the Building Department before the permit can be issued. The listed Building Division address is 850 S Madera Ave, Kerman, CA 93630.
What information does the application request?
It requests the job address, roof and roofing material details, owner and contractor information, and applicable signatures and declarations. It also includes cool-roof compliance information and a solar clearance form.

Need something notarized?

This Application for Reroof doesn’t need a notary — but if you have another Kerman form that does, a commissioned online notary can help.