El Centro, CA · Imperial County
Off-Site Improvement Plan Checklist/Application
This checklist/application helps project applicants submit off-site improvement plans and required supporting materials to the City of El Centro Engineering Division for review.
What this form is
Applicants use this checklist when submitting off-site improvement plans for a project. It lists required materials, including plan copies, project-specific erosion control or stormwater documents, applicable approvals, utility information, and an engineer’s estimate. The form says incomplete applications will not be accepted at the counter and notes that a 3.53% plan check and inspection fee is due before plan approval.
Who needs it
Applicants submitting off-site improvement plans to the City of El Centro should use this checklist to identify the required supporting materials.
How to submit it
Submit the completed materials to the Engineering Division at 1275 West Main Street, El Centro, CA 92243. The form states that incomplete applications will not be accepted at the counter.
About notarization
This checklist/application is signed and dated without a notary; it identifies no notarized attachment or sworn step, so the signer just signs and dates it.
How to submit this form
- 1
Download The Checklist
Download the Off-Site Improvement Plan Checklist/Application PDF.
- 2
Complete The Project Details
Provide the project name and location, project size, applicant contact information, and other requested details.
- 3
Gather The Required Materials
Use the checklist to assemble the plans and applicable project documents, including an engineer’s estimate.
- 4
Submit To The Engineering Division
Submit the materials at 1275 West Main Street, El Centro, CA 92243. Incomplete applications will not be accepted at the counter.
Frequently asked questions
- What is the Off-Site Improvement Plan Checklist/Application?
- It lists the plans and supporting materials applicants must provide with an off-site improvement plan submission to the City of El Centro Engineering Division.
- What materials does the checklist request?
- It requests a transmittal letter, two plan copies, applicable erosion control or stormwater documents, relevant approvals, utility details, and an engineer’s estimate.
- Do I need a notary for the Off-Site Improvement Plan Checklist/Application?
- No. This checklist/application is signed and dated without a notary; it identifies no notarized attachment or sworn step, so the signer just signs and dates it.
- How do I submit the Off-Site Improvement Plan Checklist/Application?
- Submit the completed materials to the Engineering Division at 1275 West Main Street, El Centro, CA 92243. Incomplete applications will not be accepted at the counter.
Need something notarized?
This Off-Site Improvement Plan Checklist/Application doesn’t need a notary — but if you have another El Centro form that does, a commissioned online notary can help.
