Diamond Bar, CA · Los Angeles County

No notary required

Storm Water BMP Certification

This certification documents stormwater best management practices for construction projects and is completed by the project owner and architect, engineer, or contractor of record.

What this form is

The certification records project details and confirms that required best management practices for sediment, erosion, construction materials, and runoff will be installed, monitored, and maintained. The document says these minimum requirements apply to construction projects and that a local Storm Water Pollution Prevention Plan must be submitted to the City before grading permit approval. It asks for project and contact information, certifications, signatures, and dates.

Who needs it

Project owners and the architect, engineer, or contractor of record complete and sign the certification for a construction project.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. The document says a local Storm Water Pollution Prevention Plan goes to the City before grading permit approval.

About notarization

This document is signed and dated without a notary; it mentions no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The PDF

    Download the Storm Water BMP Certification PDF.

  2. 2

    Complete Project Details

    Enter the project name, permit number, location, and owner and contractor contact information.

  3. 3

    Review Requirements

    Read the listed stormwater requirements and complete the certification, including the requested signatures and dates.

  4. 4

    Submit To The City

    Submit the certification to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Storm Water BMP Certification for?
It records project details and certifies that stormwater best management practices will be installed, monitored, and maintained at a construction site.
Who completes this certification?
The form requests project and contact information and signatures from the architect, engineer, or contractor of record and the legal landowner.
Do I need a notary for this certification?
No. This document is signed and dated without a notary, and it mentions no notarized or sworn attachment.
How do I submit this certification?
Submit it to the city department named on the form; check the city website for current contact details. The document says a local Storm Water Pollution Prevention Plan goes to the City before grading permit approval.

Need something notarized?

This Storm Water BMP Certification doesn’t need a notary — but if you have another Diamond Bar form that does, a commissioned online notary can help.