Building Permit Deferred Submittal Form

This form identifies deferred building permit items and is completed by the project owner and the architect or engineer of record for Palmdale.

What this form is

Use this form to identify items requested for deferred submittal on a building permit and confirm the responsibilities of the owner and design professionals. The form says deferred items must be reviewed by the Engineer of Record before Building and Safety submission, and approved by City staff before related construction begins. It asks for permit and project details, selected items, and signatures and dates.

Who needs it

Project owners and their architects or engineers of record use this form when requesting deferred submittal items for a Palmdale building permit.

How to submit it

Submit the deferred submittal to the Engineer of Record before Building and Safety. Submit each item under a separate permit application, with this approved form resubmitted for every deferred item.

About notarization

This document is signed without a notary; the owner, architect, and engineer sign and date it.

How to submit this form

  1. 1

    Download The Form

    Download the Building Permit Deferred Submittal Form.

  2. 2

    Complete Project Details

    Enter the permit number, project name and address, email, and total number of deferred items.

  3. 3

    Mark Deferred Items

    Mark the requested items and have the owner, architect, and engineer sign and date the form.

  4. 4

    Submit To The City

    Submit the deferred submittal to the Engineer of Record before Building and Safety; use a separate permit application for each item.

Frequently asked questions

What does the Building Permit Deferred Submittal Form do?
It identifies items requested for deferred submittal on a building permit and records project details, selected items, and signatures from the owner and design professionals.
How do I submit the deferred submittal form?
Submit the deferred submittal to the Engineer of Record before Building and Safety. Each item requires a separate permit application, and the approved form must be resubmitted with every item.
Do I need a notary for the Building Permit Deferred Submittal Form?
No. The document has signature and date lines for the owner, architect, and engineer, but no notary block or notarized attachment is specified.
What information does the form request?
It requests the building permit number, project name and address, email, number of deferred items, items selected for deferral, and signatures and dates.

Need something notarized?