Field Engineer’s Finish Grading Report

A field engineer completes this report to verify grading and drainage work for a project seeking finish grading approval in Temple City.

What this form is

The report documents a field engineer’s verification that grading and drainage work, elevations, drainage devices, roof drains, and other applicable items comply with approved plans. Temple City requires the completed report to be filed with the Building Division before finish grading approval can be given and the grading permit finalized. It asks for site and owner details, project checks, and the engineer’s name, stamp, license number, firm, address, signature, and date.

Who needs it

The owner’s retained field engineer completes the report for a project seeking finish grading approval and grading permit finalization.

How to submit it

File the completed report with the Temple City Building Division before finish grading approval can be given and the grading permit finalized.

About notarization

This document is signed without a notary; the field engineer provides a stamp and signs and dates the report.

How to submit this form

  1. 1

    Download The Report

    Download the Field Engineer’s Finish Grading Report.

  2. 2

    Complete Project Details

    Enter the site address, assessor parcel number, and owner contact details.

  3. 3

    Complete Engineer Verification

    Record applicable grading and drainage checks, then provide the field engineer’s details, stamp, signature, and date.

  4. 4

    File With The Building Division

    File the completed report with the Temple City Building Division before finish grading approval and grading permit finalization.

Frequently asked questions

What does the Field Engineer’s Finish Grading Report verify?
It records the field engineer’s verification of grading and drainage work, including applicable elevations, drainage devices, parking areas, and roof drains.
Who completes this report?
The owner’s retained field engineer completes it, providing project checks and the engineer’s identifying, licensing, stamp, signature, and date information.
Do I need a notary for the Field Engineer’s Finish Grading Report?
No. The field engineer signs and dates the report and provides a stamp; the document does not call for a notary.
How do I submit the Field Engineer’s Finish Grading Report?
File the completed report with the Temple City Building Division before finish grading approval can be given and the grading permit finalized.