Field Engineer’s Rough Grading Report
A field engineer completes this report to verify rough grading and drainage work for a project before Temple City can grant rough grading approval.
What this form is
The field engineer uses this report to verify that work within their responsibility follows the approved grading or drainage plans, soils report, and current Building Code. The completed report must be filed with the Temple City Building Division before rough grading approval can be given and security deposits refunded. It requests project and owner details, the engineer’s name and license information, business details, stamp, signature, and signing date.
Who needs it
An owner with a project requiring rough grading approval needs their retained field engineer to complete and file this report with the city.
How to submit it
File the completed report with the Temple City Building Division before rough grading approval can be given; the document does not provide an address or submission method.
About notarization
This report is signed and stamped without a notary; the field engineer signs and dates it, and no notarized attachment or sworn step is identified.
How to submit this form
- 1
Download The Report
Download the Field Engineer’s Rough Grading Report PDF.
- 2
Complete Project Details
Enter the site address, assessor parcel number, and owner’s contact information.
- 3
Have The Engineer Verify And Sign
The retained field engineer completes the applicable verification, provides license and business details, and adds a stamp, signature, and date.
- 4
File With The Building Division
File the completed report with the Temple City Building Division before rough grading approval can be given.
Frequently asked questions
- What is the Field Engineer’s Rough Grading Report?
- It is a report in which a field engineer verifies specified rough grading and drainage work against the approved plans and other stated project requirements.
- Who completes this rough grading report?
- The field engineer retained by the owner completes the report, provides project and business details, and signs and stamps it.
- Do I need a notary for the Field Engineer’s Rough Grading Report?
- No. The report calls for the field engineer’s stamp, signature, and date, but does not identify a notarized attachment or sworn step.
- How do I submit the Field Engineer’s Rough Grading Report?
- File the completed report with the Temple City Building Division before rough grading approval can be given. The document does not specify an address or submission method.
Need something notarized?
This Field Engineer’s Rough Grading Report doesn’t need a notary — but if you have another Temple City form that does, a commissioned online notary can help.