Stormwater Compliance Tracking Form for Construction Activities

Construction applicants submit this form with a grading or building permit application to provide project details and stormwater pollution prevention information.

What this form is

Seaside requires this form with a Grading or Building Permit application for construction activities. It asks for project and owner details, estimated soil disturbance, work type, schedule, and other applicable permits. If the city determines an Erosion and Sediment Control Plan is applicable, the applicant must complete page two with site-specific plan information and best management practices.

Who needs it

Applicants seeking a Grading or Building Permit for a project that involves soil disturbance need to submit this form.

How to submit it

Complete the form and submit it with your Grading or Building Permit application.

About notarization

This document is signed without a notary; the applicant signs and dates it, acknowledging receipt of the BMP plan sheet and commitment to applicable BMPs.

How to submit this form

  1. 1

    Download the Form

    Download the Stormwater Compliance Tracking Form for construction activities.

  2. 2

    Complete Project Details

    Enter the requested project, owner, contractor, soil disturbance, work, schedule, and permit information.

  3. 3

    Gather Plan Information

    If an Erosion and Sediment Control Plan is applicable, complete page two with the requested site-specific information and BMPs.

  4. 4

    Submit with Your Permit Application

    Submit the completed form with your Grading or Building Permit application.

Frequently asked questions

Do I need a notary for the Stormwater Compliance Tracking Form?
No. The form is signed without a notary; the applicant signs and dates it to acknowledge receipt of the BMP plan sheet and commitment to applicable BMPs.
How do I submit the Stormwater Compliance Tracking Form?
Complete the form and submit it with your Grading or Building Permit application, as directed by the form instructions.
What information does the form ask for?
It asks for project address, owner and contractor details, parcel size, estimated soil disturbance, project type and description, anticipated dates, and other applicable permits.
When do I need to complete page two?
The form says applicants must complete page two if an Erosion and Sediment Control Plan is applicable. It requests site-specific plan details and best management practices.

Need something notarized?

This Stormwater Compliance Tracking Form for Construction Activities doesn’t need a notary — but if you have another Seaside form that does, a commissioned online notary can help.