Auburn, CA · Placer County
Construction Waste Management Plan
New construction contractors or owners use this form to identify how construction waste will be reduced, recycled, reused, salvaged, and measured.
What this form is
The City requires this plan for every newly constructed building or structure, submitted at the time of permit application. It records the project and permit details, selected waste handler, materials diverted, sorting method, destination facility, waste-reduction methods, and whether diversion is measured by weight or volume; selecting “Other” requires a construction waste plan with these details.
Who needs it
Contractors or owners of newly constructed buildings or structures need to submit this plan with the permit application.
How to submit it
Submit the plan at the time of permit application to the Building Inspection Division, Planning and Public Works Department, at 1225 Lincoln Way, Auburn, CA 95603.
About notarization
This form is signed without a notary; the contractor or owner declares under penalty of perjury that the information is true and correct, then signs and dates it.
How to submit this form
- 1
Download The Form
Download the Construction Waste Management Plan.
- 2
Complete The Plan
Enter the permit and project details, select a waste handler, and provide the requested waste-management information.
- 3
Prepare An Other-Handler Plan
If you select “Other” as the waste handler, provide a construction waste plan with the requested diversion and management details.
- 4
Submit With The Permit Application
Submit the plan at the time of permit application to the department and address listed on the form.
Frequently asked questions
- Who submits the Construction Waste Management Plan?
- A contractor or owner submits the plan for every newly constructed building or structure at the time of the permit application.
- What information does the plan request?
- It asks for waste materials to be diverted, sorting method, destination facility, waste-reduction methods, and whether diverted material is measured by weight or volume.
- Do I need a notary for the Construction Waste Management Plan?
- No. The contractor or owner signs and dates the declaration under penalty of perjury; the form does not require notarization.
- How do I submit the Construction Waste Management Plan?
- Submit it at the time of permit application to the Building Inspection Division, Planning and Public Works Department, at the address printed on the form.