Auburn, CA · Placer County
Deferred Submittal Worksheet
Contractors, developers, architects, engineers, or owners use this worksheet to request review of deferred items for plans already in plan review.
What this form is
The worksheet requests information about deferred items for plans currently in plan review; additional items require a new permit. It asks for project, owner, contractor, and design professional details, a description of the deferred items, and the item types. The document also outlines review and approval steps, including a written request from the architect or engineer of record and a possible separate review fee.
Who needs it
A contractor, developer, architect, engineer, or owner submitting a request for deferred items on plans in plan review should complete this worksheet.
How to submit it
Submit the worksheet to the Building Inspection Division at 1225 Lincoln Way, Auburn, CA 95603. The document lists a minimum one-hour charge at rates per the approved City of Auburn Master Fee Schedule and says a separate review fee may be charged.
About notarization
This document is signed and dated without a notary; it mentions no notarized or sworn attachment, so the signer just signs and dates it.
How to submit this form
- 1
Download the Worksheet
Download the Deferred Submittal Worksheet PDF.
- 2
Complete the Project Details
Provide the project, owner, contractor, and architect or engineer information requested.
- 3
Describe Deferred Items
Describe the deferred items and identify their types; include the written request from the architect or engineer of record listing items and reasons for deferral.
- 4
Submit to the City
Submit the worksheet to the Building Inspection Division at 1225 Lincoln Way, Auburn, CA 95603.
Frequently asked questions
- What is the Deferred Submittal Worksheet for?
- It provides project and deferred-item details for a request to review items related to plans currently in plan review.
- Who completes this worksheet?
- The document says a contractor, developer, architect, engineer, or owner must complete the information when submitting a request for deferred items.
- Do I need a notary for the Deferred Submittal Worksheet?
- No. This document is signed and dated without a notary, and it mentions no notarized or sworn attachment.
- How do I submit the Deferred Submittal Worksheet?
- Submit it to the Building Inspection Division at 1225 Lincoln Way, Auburn, CA 95603. The document also lists the division’s phone number and website.
