Auburn, CA · Placer County
Plan Revision Form
Property owners or project representatives use this form to request review of changes to plans submitted for a building permit.
What this form is
The Plan Revision Form records the project address, permit number, inspector, whether planning or fire review is required, and a brief description of the revision. The form says changes to the job copy plans must be approved by Building & Safety and that revised drawings must be clearly clouded. Submit three copies of scaled drawings matching the original paper size, with the required minimum fee.
Who needs it
A person requesting a revision to plans for a project with a City of Auburn building permit should complete this form.
How to submit it
Submit the form with three copies of scaled drawings on the same paper size as the original plans. A minimum fee of $169 is required at submittal; additional charges may apply based on review time.
About notarization
This document is signed without a notary; the signer just provides their name and date, and the form mentions no notarized or sworn attachment.
How to submit this form
- 1
Download The Form
Download the Plan Revision Form for the project.
- 2
Complete The Form
Enter the project address, permit number, inspector, review requirements, revision description, name, date, and phone number.
- 3
Prepare Drawings
Clearly cloud the revisions and prepare three scaled drawing copies on the same paper size as the original plans.
- 4
Submit To The City
Submit the form and drawings at revision submittal with the minimum $169 fee; additional review charges may apply.
Frequently asked questions
- What is the Plan Revision Form used for?
- It records a requested plan revision for a building permit project, including the project address, permit number, review needs, and a brief description of the change.
- What must I submit with the form?
- Submit three copies of scaled drawings on the same paper size as the originally submitted plans. The form states that a minimum fee of $169 is required at submittal.
- Do I need a notary for the Plan Revision Form?
- No. This form is signed without a notary; the signer provides their name and date, and the form mentions no notarized or sworn attachment.
- How do I submit the Plan Revision Form?
- Submit it with three copies of the revised scaled drawings at the time of revision submittal. The form names the Building Safety & Inspection Division and states the minimum fee.
