Fontana, CA · San Bernardino County
Driveway Approach Construction Permit Application
Property owners and their representatives use this application to request a permit for driveway approach work in a public right-of-way.
What this form is
Fontana requires a Driveway Approach Construction Permit before removing, altering, or constructing a curb, gutter, sidewalk, pavement, or related improvement in a public right-of-way. This application is for non-development-driven residential, commercial, and industrial projects. It asks for project and property details, applicant and owner contact information, contractor information, review type, project description, driveway width, and owner certification; an exhibit of the driveway approach is also required.
Who needs it
Property owners undertaking non-development-driven driveway approach work in a public right-of-way, or their representatives, need this application and an exhibit of the proposed approach.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed and dated without a notary; if someone other than the legal property owner signs, a notarized authorization letter from the owner must accompany it.
How to submit this form
- 1
Download the Application
Download the Driveway Approach Construction Permit Application PDF.
- 2
Complete the Application
Provide project, property, applicant, owner, and contractor details; select the review type and describe the proposed work.
- 3
Gather the Required Exhibit
Include an exhibit of the driveway approach and consult the attached submittal checklist for requirements specific to the review type.
- 4
Submit to the City
Submit the application and required exhibit to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Driveway Approach Construction Permit Application?
- No. The application is signed and dated without a notary. If someone other than the legal property owner signs, a notarized authorization letter from the owner must accompany it.
- What must accompany the application?
- The document lists an exhibit of the driveway approach as a required submittal, along with the application. It also refers applicants to an attached submittal checklist for specific requirements.
- How do I submit the Driveway Approach Construction Permit Application?
- Submit it to the city department named on the form; check the city website for current contact details.
- When is a driveway approach permit required?
- The document says a permit is needed before removing, altering, or constructing a curb, gutter, sidewalk, pavement, or related improvement associated with a driveway approach in a public right-of-way.
Need something notarized?
This Driveway Approach Construction Permit Application doesn’t need a notary — but if you have another Fontana form that does, a commissioned online notary can help.
