Fontana, CA · San Bernardino County

No notary required

Driveway Approach Construction Permit Application

Property owners and their representatives use this application to request a permit for driveway approach work in a public right-of-way.

What this form is

Fontana requires a Driveway Approach Construction Permit before removing, altering, or constructing a curb, gutter, sidewalk, pavement, or related improvement in a public right-of-way. This application is for non-development-driven residential, commercial, and industrial projects. It asks for project and property details, applicant and owner contact information, contractor information, review type, project description, driveway width, and owner certification; an exhibit of the driveway approach is also required.

Who needs it

Property owners undertaking non-development-driven driveway approach work in a public right-of-way, or their representatives, need this application and an exhibit of the proposed approach.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; if someone other than the legal property owner signs, a notarized authorization letter from the owner must accompany it.

How to submit this form

  1. 1

    Download the Application

    Download the Driveway Approach Construction Permit Application PDF.

  2. 2

    Complete the Application

    Provide project, property, applicant, owner, and contractor details; select the review type and describe the proposed work.

  3. 3

    Gather the Required Exhibit

    Include an exhibit of the driveway approach and consult the attached submittal checklist for requirements specific to the review type.

  4. 4

    Submit to the City

    Submit the application and required exhibit to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Driveway Approach Construction Permit Application?
No. The application is signed and dated without a notary. If someone other than the legal property owner signs, a notarized authorization letter from the owner must accompany it.
What must accompany the application?
The document lists an exhibit of the driveway approach as a required submittal, along with the application. It also refers applicants to an attached submittal checklist for specific requirements.
How do I submit the Driveway Approach Construction Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
When is a driveway approach permit required?
The document says a permit is needed before removing, altering, or constructing a curb, gutter, sidewalk, pavement, or related improvement associated with a driveway approach in a public right-of-way.

Need something notarized?

This Driveway Approach Construction Permit Application doesn’t need a notary — but if you have another Fontana form that does, a commissioned online notary can help.