Fontana, CA · San Bernardino County

No notary required

Oversize Load Permit Application

The Oversize Load Permit Application requests City of Fontana permission for a proposed oversize load move and is completed by the applicant.

What this form is

Use this application to request a City of Fontana permit for moving an oversize load on designated truck routes, with local access for pickup or delivery. It asks for applicant and contact details, load and hauling equipment dimensions, origin, destination, proposed route and move time, and permit type. The application also includes insurance information and a signature and date field.

Who needs it

Applicants seeking a City of Fontana permit to move an oversize load on city routes should complete this application.

How to submit it

The form lists the City of Fontana Department of Engineering at 8353 Sierra Avenue, Fontana, CA 92335, and [email protected]. The fee schedule is included in the document.

About notarization

This document is signed without a notary; the applicant signs and dates the application, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download the Application

    Download the Oversize Load Permit Application.

  2. 2

    Complete the Application

    Enter applicant and contact details, load and vehicle dimensions, origin, destination, requested route, proposed move time, and permit type.

  3. 3

    Review Permit Requirements

    Review the special provisions and pilot car requirements, and provide the insurance information requested on the form.

  4. 4

    Sign and Submit

    Sign and date the application, then submit it to the City of Fontana Department of Engineering using the contact information listed on the form.

Frequently asked questions

Do I need a notary for the Oversize Load Permit Application?
No. The application has a signature and date field but no notary block; the applicant signs and dates it. No notarized or sworn attachment is identified.
How do I submit the Oversize Load Permit Application?
The form lists the Department of Engineering at 8353 Sierra Avenue, Fontana, CA 92335, and [email protected]. It does not specify a submission method.
What information does the application request?
It requests applicant and contact details, load and hauling equipment dimensions, origin, destination, proposed route and move time, permit type, insurance information, and the applicant’s signature and date.
How long does permit processing take?
The document says the city requires at least two working days to process and issue permits. Applications for unusually large and heavy loads may require up to three weeks for review and approval.

Need something notarized?

This Oversize Load Permit Application doesn’t need a notary — but if you have another Fontana form that does, a commissioned online notary can help.