Fontana, CA · San Bernardino County

No notary required

Utility Permit Application

Fontana’s Utility Permit Application is for applicants seeking a permit for utility work at a specific location in the public right of way.

What this form is

The application collects project location and work details, contractor information, and traffic-control details for utility work. A Traffic Control Permit is required for work within the public right of way and must be obtained before work begins; the document says to submit a separate application for each work location. Contractor license and insurance documentation must also be submitted.

Who needs it

Applicants planning utility work within Fontana’s public right of way need this application, with a separate application for each work location.

How to submit it

Submit the completed application to [email protected] or call (909) 350-7610 for submittal instructions. The document lists a $107 application fee.

About notarization

This document is signed without a notary; it lists contractor license and insurance documents as required submissions, and the signer just signs and dates it.

How to submit this form

  1. 1

    Download the Application

    Download the Utility Permit Application PDF.

  2. 2

    Complete the Application

    Provide the project location, proposed work details, contractor information, and applicable traffic-control information.

  3. 3

    Gather Required Documents

    Include copies of the contractor’s state license, general liability insurance, and workers compensation insurance.

  4. 4

    Submit to the City

    Email the completed application to [email protected] or call (909) 350-7610 for submittal instructions.

Frequently asked questions

What is the Utility Permit Application for?
It provides project, contractor, and traffic-control information for utility work in Fontana’s public right of way.
What supporting documents does the application require?
The document says to submit a copy of the contractor’s state license, general liability insurance, and workers compensation insurance.
Do I need a notary for the Utility Permit Application?
No. This document is signed without a notary; it lists contractor license and insurance documents as required submissions, and the signer just signs and dates it.
How do I submit the Utility Permit Application?
Email the completed application to [email protected] or call (909) 350-7610 for submittal instructions.

Need something notarized?

This Utility Permit Application doesn’t need a notary — but if you have another Fontana form that does, a commissioned online notary can help.