Coronado, CA · San Diego County
Deferred Submittal Certification
This certification documents a deferred submittal for permitted construction plans and is completed by the architect or engineer of record.
What this form is
Use this form to process deferred submittal items for approved, permitted construction documents and plans. It asks for the permit, project address, deferred submittal item, and whether the item changes the exterior, floor plans, floor area, or structure. The architect or engineer of record certifies that the item generally conforms to the project design and signs and dates the form.
Who needs it
The architect or engineer of record for a permitted project completes the certification when processing a deferred submittal.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This certification is signed and dated without a notary; the architect or engineer of record signs it, and the document identifies no notarized or sworn attachment.
How to submit this form
- 1
Download The Form
Download the Deferred Submittal Certification for the permitted project.
- 2
Complete Project Details
Enter the permit, project address, deferred submittal item, and responses about possible project changes.
- 3
Obtain Design Review
Have the architect or engineer of record review the deferred submittal plans and documents.
- 4
Sign And Submit
The architect or engineer of record signs and dates the certification. Submit it to the city department named on the form.
Frequently asked questions
- What does the Deferred Submittal Certification document?
- It records the deferred submittal item, project details, and whether the item changes the project's exterior, floor plans, floor area, or structure. The architect or engineer of record certifies general design conformance.
- Who completes the certification?
- The architect or engineer of record for the permitted project completes and signs the certification after reviewing the deferred submittal plans and documents.
- Do I need a notary for the Deferred Submittal Certification?
- No. The architect or engineer of record signs and dates this certification without a notary; the document identifies no notarized or sworn attachment.
- How do I submit the Deferred Submittal Certification?
- Submit it to the city department named on the form; check the city website for current contact details.
