Escondido, CA · San Diego County
Administrative Extension of Time Application
Property owners or authorized representatives use this application to request more time for qualifying Escondido approvals in cases that did not involve a public hearing.
What this form is
This application requests an extension for an unexercised permit or approval, and is limited to administrative cases that did not involve a public hearing. The written request must be submitted before the approval expires, with the required fee. The form asks for applicant, owner, site, and project details, a description and justification, signatures, and supporting materials listed in the instructions.
Who needs it
A property owner or authorized representative seeking more time for an eligible Escondido approval must submit this application before it expires.
How to submit it
The form lists the Planning Division at 201 North Broadway, Escondido, CA 92025-2798. It says a pre-application meeting with Planning staff is necessary before submitting; call (760) 839-4671 for an appointment.
About notarization
This document is signed without a notary; the property owner certifies under penalty of perjury, and the form does not require a notarized attachment.
How to submit this form
- 1
Download the Application
Download the Administrative Extension of Time Application and review its instructions and submittal requirements.
- 2
Meet with Planning Staff
Arrange the required pre-application meeting with Planning staff by calling (760) 839-4671.
- 3
Complete and Sign the Form
Provide applicant, owner, site, and project information, describe and justify the request, and obtain the required signatures.
- 4
Gather Required Materials
Include six full-sized plan sets, the hazardous wastes disclosure, the SDG&E notification form, and fees; staff may require other materials.
- 5
Submit to the Planning Division
Submit the request before the approval expires to the Planning Division at 201 North Broadway, Escondido, CA 92025-2798.
Frequently asked questions
- Do I need a notary for the Administrative Extension of Time Application?
- No. The form has signature lines but no notary block. The property owner certifies under penalty of perjury; that certification does not say a notary is required.
- Who can request an administrative extension of time?
- The form says a property owner or authorized representative may make a written request for an extension before the approval expires.
- What materials does the application require?
- The instructions list a completed, signed form, six full-sized plan sets, a hazardous wastes disclosure, an SDG&E notification form, and fees. Staff may require additional materials.
- How do I submit the Administrative Extension of Time Application?
- First arrange the required pre-application meeting with Planning staff by calling (760) 839-4671. The form lists the Planning Division at 201 North Broadway, Escondido, CA 92025-2798.
Need something notarized?
This Administrative Extension of Time Application doesn’t need a notary — but if you have another Escondido form that does, a commissioned online notary can help.