Escondido, CA · San Diego County
Extension of Time for Previously Approved Case Number
Property owners or authorized representatives use this application to request more time for a previously approved permit that has not yet been exercised.
What this form is
This application requests an extension for a previously approved permit that has not been exercised. The written request must be submitted before the permit expires, and the project must conform to current City standards. Applicants provide plans, fees, slope information, and signatures; the City may require additional information, photographs, or a details-of-request form.
Who needs it
A property owner or authorized representative seeking more time for a previously approved permit that has not been exercised needs this application.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the property owner certifies under penalty of perjury, and the signer dates the applicable signature line.
How to submit this form
- 1
Download The Application
Download the Extension of Time application PDF.
- 2
Complete And Sign
Complete the application and obtain the required applicant and property owner signatures; professional drawings require an architect or engineer signature.
- 3
Gather Required Materials
Prepare the required plan sets, photographic reductions, fees, and slope analysis; include additional materials if requested by Planning staff.
- 4
Submit To The City
Submit the application before the permit expires. Check the city website for current contact details.
Frequently asked questions
- What is the Extension of Time application for?
- It requests more time for a previously approved permit that has not been exercised. The written request must be submitted before the permit expires.
- Who needs to sign the application?
- The applicant and property owner must sign, even if they are the same person. An architect or engineer must also sign if professional drawings are submitted.
- Do I need a notary for the Extension of Time application?
- No. The document has signature and date lines but no notary block. The property owner certifies under penalty of perjury.
- How do I submit the Extension of Time application?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Extension of Time for Previously Approved Case Number doesn’t need a notary — but if you have another Escondido form that does, a commissioned online notary can help.
