Poway, CA · San Diego County
Construction Hydrant Meter Application
Poway’s application lets a company or authorized representative request hydrant meter water service for a construction location.
What this form is
Use this application to request water service through a construction hydrant meter at a specified location. It asks for company and contact details, the requested meter location, and the applicant’s signature, and includes water service terms and backflow device requirements. The form says to submit the completed application with the deposit in person before the meter is installed.
Who needs it
A company or authorized representative requesting construction water service through a hydrant meter in Poway needs this application.
How to submit it
Complete the form and bring it with the deposit in person to Customer Services at City Hall, 13325 Civic Center Drive, Poway, CA 92064.
About notarization
This application is signed and dated without a notary; the form does not identify a notarized or sworn attachment.
How to submit this form
- 1
Download The Application
Download the Construction Hydrant Meter Application PDF.
- 2
Complete The Form
Enter company, contact, and requested meter location details, then review the water service terms and sign.
- 3
Gather The Deposit
Prepare the deposit required by the application to submit with the completed form.
- 4
Submit In Person
Bring the application and deposit to Customer Services at City Hall, 13325 Civic Center Drive, Poway.
Frequently asked questions
- What is the Construction Hydrant Meter Application for?
- It requests water service through a construction hydrant meter at a specified location and includes the applicant’s contact information and agreement to service terms.
- Who can use this application?
- A company or authorized representative requesting hydrant meter water service in Poway can complete and submit the application.
- Do I need a notary for the Construction Hydrant Meter Application?
- No. The application is signed and dated without a notary, and the form does not identify a notarized or sworn attachment.
- How do I submit the Construction Hydrant Meter Application?
- Bring the completed application and deposit in person to Customer Services at City Hall, 13325 Civic Center Drive, Poway, CA 92064.
Need something notarized?
This Construction Hydrant Meter Application doesn’t need a notary — but if you have another Poway form that does, a commissioned online notary can help.
