Poway, CA · San Diego County

No notary required

Disposition of Swimming Pool Excavation Soils

Property owners or agents complete this form to identify where swimming pool excavation soil will go and address grading permit and erosion control requirements.

What this form is

This form identifies the location where soil from a swimming pool excavation will be deposited and helps determine whether a Grading Permit is required. It asks for pool and fill-site details, soil quantity, permit and authorization information, and required signatures. Attach written authorization from the fill-site owner before hauling material there; onsite fill over three feet requires a soils compaction report or letter.

Who needs it

Property owners or agents and contractors complete and sign this form before issuance of a Building Permit for a pool.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details. After excavation, call (858) 668-4632 to schedule an inspection.

About notarization

This document is signed without a notary; the property owner or agent and contractor sign and date it, and the form does not identify a notarized attachment.

How to submit this form

  1. 1

    Download the Form

    Download the Disposition of Swimming Pool Excavation Soils form.

  2. 2

    Complete the Form

    Provide the pool address, property and fill-site owner details, fill quantity, permit information, and required signatures.

  3. 3

    Gather Attachments

    Attach written authorization before hauling material to a fill site; include a compaction report or letter when required for onsite fill.

  4. 4

    Submit to the City

    Submit the form to the city department named on it. After excavation, call (858) 668-4632 to schedule an inspection.

Frequently asked questions

Do I need a notary for the Disposition of Swimming Pool Excavation Soils form?
No. The property owner or agent and contractor sign and date the form; it does not identify a notarized attachment.
How do I submit the pool excavation soil form?
Submit it to the city department named on the form and check the city website for current contact details. After excavation, call (858) 668-4632 to schedule an inspection.
What attachment may be required for soil hauled to a fill site?
If material will be hauled to a fill site, attach a copy of the property owner's written authorization before hauling.
When does onsite fill require a compaction report?
If fill is kept onsite for a pool slide or other decorative accessories and exceeds three feet in vertical height, a soils compaction report or letter is required.

Need something notarized?

This Disposition of Swimming Pool Excavation Soils doesn’t need a notary — but if you have another Poway form that does, a commissioned online notary can help.