San Marcos, CA · San Diego County

No notary required

Engineering Inspection Package Form EI-1

This checklist and contact form is for applicants submitting an engineering inspection package to San Marcos before permit issuance when requested by the City.

What this form is

The package checklist identifies materials the applicant must provide to the Land Development Division before permit issuance. Submit the package only when the City requests it. The form also gives grading inspection requirements and collects contact details for the civil engineer, land surveyor, grading contractor, soils engineer, and qualified SWPPP practitioner.

Who needs it

Applicants whose grading or development permit requires an engineering inspection package need to complete the contact information and gather the listed submittal items.

How to submit it

Submit the package to the Land Development Division before permit issuance, and only when the City requests it. The document says the package will be forwarded to the Engineering Inspection Division.

About notarization

This form is signed and dated without a notary; one required attachment is a signed and notarized Subdivision or Development Agreement.

How to submit this form

  1. 1

    Download The Package Form

    Download the Engineering Inspection Package Form EI-1 and review its checklist and grading inspection requirements.

  2. 2

    Complete The Contact Form

    Fill in the grading permit details and contact information for the listed project professionals, then sign and date the acknowledgment.

  3. 3

    Gather Required Items

    Use the checklist to assemble the required plans, reports, permits, and other items indicated by the City.

  4. 4

    Submit When Requested

    Submit the package to the Land Development Division when the City requests it and before permit issuance.

Frequently asked questions

What is the Engineering Inspection Package Form EI-1?
It is a checklist of package submittal items, grading inspection requirements, and contact information fields for the engineering inspection process.
When should I submit the inspection package?
Submit the package only when the City requests it, and provide it to the Land Development Division before permit issuance.
Do I need a notary for the Engineering Inspection Package Form EI-1?
No. The form itself is signed and dated without a notary. A required attachment is a signed and notarized Subdivision or Development Agreement.
How do I submit the Engineering Inspection Package Form EI-1?
Submit the package to the Land Development Division when the City requests it. The document says it will be forwarded to the Engineering Inspection Division.

Need something notarized?

This Engineering Inspection Package Form EI-1 doesn’t need a notary — but if you have another San Marcos form that does, a commissioned online notary can help.