Mountain House, CA · San Joaquin County

No notary required

Solar PV Re-Roofing Policy (Residential)

This policy and clearance form is for homeowners whose residence has an existing rooftop solar PV system that must be removed and reinstalled for re-roofing.

What this form is

The form collects the property address, homeowner contact details, solar system ownership status, and the homeowner’s certification of compliance. Homeowners must submit it with a plan or clear photo of the existing PV array layout before the permit for re-roofing can be issued; changes to the original system require a separate permit.

Who needs it

Homeowners re-roofing a residence with an existing rooftop solar PV system that must be removed and reinstalled need to complete and submit this form.

How to submit it

Submit the completed form and a plan or clear photo of the existing PV array layout to the Building Department before the re-roof permit can be issued. The document lists 251 E. Main Street, Mountain House, CA 95391, and [email protected].

About notarization

This document is signed and dated by the homeowner without a notary; provide the existing PV array layout plan or a clear photo, with no sworn attachment identified.

How to submit this form

  1. 1

    Download The Form

    Download the Solar PV Re-Roofing Policy and Homeowner Re-Roofing Clearance Form.

  2. 2

    Complete The Homeowner Form

    Enter the property address and homeowner contact details, indicate whether the PV system is owned or leased, and complete the certification.

  3. 3

    Gather The PV Layout

    Include a plan or clear photo of the existing PV array layout.

  4. 4

    Sign And Submit

    Sign and date the form, then submit it to the Building Department before the re-roof permit can be issued.

Frequently asked questions

Do I need a notary for the Solar PV Re-Roofing Clearance Form?
No. The homeowner signs and dates the form without a notary. Provide a plan or clear photo of the existing PV array layout; no sworn attachment is identified.
How do I submit the Solar PV Re-Roofing Clearance Form?
Submit the completed form and an existing PV array layout plan or clear photo to the Building Department before the re-roof permit can be issued.
What information does the form request?
It asks for the property address, homeowner’s name and phone number, whether the PV system is owned or leased, and the homeowner’s compliance certification and signature.
Does changing the solar PV system require a separate permit?
Yes. The policy says modifications to the original PV system require a separate permit, including changes to its location, added modules, or equipment upgrades.

Need something notarized?

This Solar PV Re-Roofing Policy (Residential) doesn’t need a notary — but if you have another Mountain House form that does, a commissioned online notary can help.