Mountain House, CA · San Joaquin County
Solar PV Re-Roofing Policy (Residential)
This policy and clearance form is for homeowners whose residence has an existing rooftop solar PV system that must be removed and reinstalled for re-roofing.
What this form is
The form collects the property address, homeowner contact details, solar system ownership status, and the homeowner’s certification of compliance. Homeowners must submit it with a plan or clear photo of the existing PV array layout before the permit for re-roofing can be issued; changes to the original system require a separate permit.
Who needs it
Homeowners re-roofing a residence with an existing rooftop solar PV system that must be removed and reinstalled need to complete and submit this form.
How to submit it
Submit the completed form and a plan or clear photo of the existing PV array layout to the Building Department before the re-roof permit can be issued. The document lists 251 E. Main Street, Mountain House, CA 95391, and [email protected].
About notarization
This document is signed and dated by the homeowner without a notary; provide the existing PV array layout plan or a clear photo, with no sworn attachment identified.
How to submit this form
- 1
Download The Form
Download the Solar PV Re-Roofing Policy and Homeowner Re-Roofing Clearance Form.
- 2
Complete The Homeowner Form
Enter the property address and homeowner contact details, indicate whether the PV system is owned or leased, and complete the certification.
- 3
Gather The PV Layout
Include a plan or clear photo of the existing PV array layout.
- 4
Sign And Submit
Sign and date the form, then submit it to the Building Department before the re-roof permit can be issued.
Frequently asked questions
- Do I need a notary for the Solar PV Re-Roofing Clearance Form?
- No. The homeowner signs and dates the form without a notary. Provide a plan or clear photo of the existing PV array layout; no sworn attachment is identified.
- How do I submit the Solar PV Re-Roofing Clearance Form?
- Submit the completed form and an existing PV array layout plan or clear photo to the Building Department before the re-roof permit can be issued.
- What information does the form request?
- It asks for the property address, homeowner’s name and phone number, whether the PV system is owned or leased, and the homeowner’s compliance certification and signature.
- Does changing the solar PV system require a separate permit?
- Yes. The policy says modifications to the original PV system require a separate permit, including changes to its location, added modules, or equipment upgrades.
Need something notarized?
This Solar PV Re-Roofing Policy (Residential) doesn’t need a notary — but if you have another Mountain House form that does, a commissioned online notary can help.
