This worksheet collects project and stormwater design information from project owners and responsible parties submitting small or regulated projects for plan review.

What this form is

The worksheet documents project details, project applicability, drainage management areas, stormwater controls, and supporting hydrology information for post-construction review. The document lists submittal requirements for small and regulated projects, including site plans and calculator results; regulated projects also require design drawings and an Operation and Maintenance Plan with a signed Statement of Responsibility.

Who needs it

Project owners and responsible parties submitting small or regulated projects for post-construction plan review need to complete the applicable worksheet pages.

How to submit it

The document says to submit the completed worksheet and required supporting materials to the plan checker. It does not provide a submission address, email, portal, or fee information.

About notarization

This document is signed without a notary; regulated project submittals include a signed Statement of Responsibility, and the worksheet does not say it must be notarized.

How to submit this form

  1. 1

    Download The Worksheet

    Download the Post-Construction Project Worksheet PDF.

  2. 2

    Complete Applicable Pages

    Fill in the project summary and the applicable small project or regulated project sections.

  3. 3

    Gather Required Attachments

    Include the required site plans and calculator results; regulated projects also require applicable design drawings and an Operation and Maintenance Plan with a signed Statement of Responsibility.

  4. 4

    Submit To The Plan Checker

    Submit the completed worksheet and required supporting materials to the plan checker.

Frequently asked questions

What is the Post-Construction Project Worksheet for?
It collects project summary, stormwater design, drainage management area, hydrology, and control measure information for post-construction plan review.
Who completes this worksheet?
Project owners and responsible parties complete the applicable pages for small or regulated projects. A separate DMA submittal sheet is required for each drainage management area in a regulated project.
Do I need a notary for the Post-Construction Project Worksheet?
No. This worksheet does not require notarization. Regulated project submittals include a signed Statement of Responsibility, but the document does not say that statement must be notarized.
How do I submit the Post-Construction Project Worksheet?
Submit the completed worksheet and required supporting materials to the plan checker. The document does not provide an address, email, or portal for submission.

Need something notarized?

This Post-Construction Project Worksheet doesn’t need a notary — but if you have another Ripon form that does, a commissioned online notary can help.