Arroyo Grande, CA · San Luis Obispo County
Engineering Grading Inspection Report
Engineers use this report to certify rough and final grading work for a project in Arroyo Grande.
What this form is
This report records inspections and certifications for rough and final grading, including whether work follows approved plans and applicable city grading requirements. It asks for permit and project details, property owner and lot information, inspection findings, and engineer stamps, signatures, and dates. It also asks whether tract grading is complete and whether pad certifications are included.
Who needs it
Project owners and their soils or civil engineers use the report to document rough and final grading inspections.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This report is signed without a notary; the soils and civil engineers sign and date their certifications.
How to submit this form
- 1
Download The Report
Download the Engineering Grading Inspection Report PDF.
- 2
Complete Project Details
Enter the permit number, project address, property owner, and lot number, and complete the applicable inspection sections.
- 3
Gather Referenced Certifications
The form asks whether pad certifications, including survey and geotechnical materials, are included.
- 4
Sign And Date
Have the soils and civil engineers complete, stamp, sign, and date their certifications.
- 5
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What does the Engineering Grading Inspection Report document?
- It records rough and final grading inspection findings and engineer certifications, including whether work follows approved plans and applicable city grading requirements.
- Who completes the grading inspection report?
- The report includes sections for soils and civil engineers to record findings, provide stamps, and sign and date their certifications.
- Do I need a notary for the Engineering Grading Inspection Report?
- No. The report is signed without a notary; the soils and civil engineers sign and date their certifications.
- How do I submit the Engineering Grading Inspection Report?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Engineering Grading Inspection Report doesn’t need a notary — but if you have another Arroyo Grande form that does, a commissioned online notary can help.
