Arroyo Grande, CA · San Luis Obispo County

No notary required

Stormwater Detention Feature Inspection Form

This inspection form is for inspectors documenting the condition and maintenance needs of stormwater detention features in Arroyo Grande.

What this form is

The form records an inspection of a stormwater detention feature, including its type, vegetation, inlets and outlets, sediment, sidewalls, debris, and maintenance needs. The city requests submission by June 1 each year. Inspectors also report whether maintenance has been scheduled and whether photographs were taken and submitted; labeling photos with the feature’s BMP number is requested.

Who needs it

Inspectors responsible for stormwater detention features in Arroyo Grande use this form to document inspection findings and maintenance needs.

How to submit it

Submit by June 1 each year by email to [email protected] or by mail to Attn: City Engineer, Community Development, 300 East Branch St, Arroyo Grande, CA 93420.

About notarization

No notary is required; the form asks for the inspection date and inspector name and includes no sworn or notarized attachment.

How to submit this form

  1. 1

    Download The Form

    Download the Stormwater Detention Feature Inspection Form PDF.

  2. 2

    Complete The Inspection Details

    Enter the inspection date, inspector name, BMP number, feature type, inspection type, and condition findings.

  3. 3

    Record Maintenance And Photos

    Indicate whether maintenance has been scheduled and whether photographs were taken or submitted; label photos with the feature’s BMP number.

  4. 4

    Submit To The City

    Submit by June 1 each year by email or mail to the City Engineer, Community Development, using the form’s listed contact details.

Frequently asked questions

What does the Stormwater Detention Feature Inspection Form record?
It records inspection details and conditions such as vegetation, inlets and outlets, sediment, sidewalls, debris, maintenance needs, and photographs.
When should I submit the inspection form?
The form says to submit it by June 1 each year.
How do I submit the Stormwater Detention Feature Inspection Form?
Email it to [email protected] or mail it to Attn: City Engineer, Community Development, 300 East Branch St, Arroyo Grande, CA 93420.
Do I need a notary for the Stormwater Detention Feature Inspection Form?
No. The form asks for the inspection date and inspector name and includes no sworn or notarized attachment.

Need something notarized?

This Stormwater Detention Feature Inspection Form doesn’t need a notary — but if you have another Arroyo Grande form that does, a commissioned online notary can help.