Atascadero, CA · San Luis Obispo County

No notary required

Administrative Use Permit Checklist

This checklist helps applicants prepare materials for an Administrative Use Permit submission to the City of Atascadero Planning Division.

What this form is

Use this checklist to prepare an Administrative Use Permit submittal; the city requires an intake meeting for all applications and does not accept incomplete or walk-in submittals at the counter. It lists general application materials and a design package or conceptual plan set, including a signed Planning Application, project description, justification, title report or qualifying landlord approval, applicable fees, and plans. Additional case-specific documentation may be required.

Who needs it

Applicants proposing projects evaluated through an Administrative Use Permit use this checklist to assemble materials for a Planning Division intake meeting.

How to submit it

Schedule an intake meeting with a staff planner; meetings are by appointment only, Monday through Friday, 8:30 a.m. to 4:00 p.m. Contact Planning staff for a digital folder link before the meeting, and email [email protected] for fee calculation.

About notarization

This checklist has no notary block; the accompanying Planning Application requires an accepted wet or digital signature, and no sworn or notarized attachment is specified.

How to submit this form

  1. 1

    Download The Checklist

    Download the Administrative Use Permit Checklist and review its general application materials and design package requirements.

  2. 2

    Prepare The Application

    Complete the Planning Application and gather the written project description, justification statement, and applicable title or landlord documentation.

  3. 3

    Gather Plans And Attachments

    Prepare the site plan and any required elevations or floor plans. Ask Planning staff whether additional information is needed.

  4. 4

    Arrange Digital Materials

    Contact Planning staff for a digital folder link before the intake meeting; digital copies are required even with a paper submittal.

  5. 5

    Attend The Intake Meeting

    Schedule a meeting with a staff planner. Incomplete and walk-in submittals are not accepted at the counter.

Frequently asked questions

What is the Administrative Use Permit Checklist for?
It lists general application materials and design package items for an Administrative Use Permit submittal to the City of Atascadero.
Do I need a notary for the Administrative Use Permit Checklist?
No. This checklist has no notary block. The accompanying Planning Application requires an accepted wet or digital signature; no sworn or notarized attachment is specified.
How do I submit the Administrative Use Permit materials?
Schedule an intake meeting with a staff planner. Meetings are by appointment only, Monday through Friday, 8:30 a.m. to 4:00 p.m.; contact Planning staff for a digital folder link before the meeting.
What materials does the checklist identify?
It identifies a signed Planning Application, written project description, justification statement, title report or qualifying landlord approval, applicable fees, site plan, and other plans or supporting information as needed.

Need something notarized?

This Administrative Use Permit Checklist doesn’t need a notary — but if you have another Atascadero form that does, a commissioned online notary can help.