Carpinteria, CA · Santa Barbara County
Post-Construction Waste Management Plan Report
This report documents construction or demolition project waste quantities, handling, and destinations for a project owner or contractor to submit.
What this form is
Use this report to document waste generated by a construction or demolition project and show whether the project meets the required 65% waste reduction. It asks for the project or permit number, location, material quantities, reuse and recycling amounts, disposal estimates, and destination names. The accompanying worksheet helps convert material quantities to tons; actual quantities should be supported by measurement records.
Who needs it
A person responsible for a construction or demolition project who must report its waste quantities, handling methods, and material destinations needs this form.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This report is signed and dated without a notary; submit copies of weight tags, gate receipts, or other measurement records with the report.
How to submit this form
- 1
Download the Report
Download the Post-Construction Waste Management Plan Report and its materials conversion worksheet.
- 2
Complete Project Details
Enter the project or permit number and address or location, then estimate material quantities and handling methods.
- 3
Gather Measurement Records
Use actual quantities based on weight tags, gate receipts, or other measurement records, and prepare copies to submit.
- 4
Submit to the City
Sign and date the report, include copies of measurement records, and check the city website for current submission details.
Frequently asked questions
- Do I need a notary for the Post-Construction Waste Management Plan Report?
- No. The report has a signature and date line, but no notary block. Include copies of weight tags, gate receipts, or other measurement records.
- How do I submit the Post-Construction Waste Management Plan Report?
- The document does not provide a submission address, email, or portal. Check the city website for current contact details.
- What information does the report ask for?
- It asks for the project or permit number and location, quantities of materials generated, reused, recycled, or disposed, and anticipated material destinations.
- What records should accompany the report?
- The worksheet says to submit copies of weight tags, gate receipts, or other records of measurement with the report.
Need something notarized?
This Post-Construction Waste Management Plan Report doesn’t need a notary — but if you have another Carpinteria form that does, a commissioned online notary can help.
