Carpinteria, CA · Santa Barbara County
Stormwater Control Plan Template
This template helps project owners and their representatives prepare a Stormwater Control Plan for a project in Carpinteria.
What this form is
Project owners and their representatives use this template to describe a project's site, drainage design, low-impact development strategies, source controls, and stormwater facility maintenance. It is intended for use with the Santa Barbara Project Clean Water Stormwater Technical Guide. The template requests project data, drainage management area descriptions, structural control measure sizing, and certifications; it also identifies a Stormwater Control Measures Sizing Calculator as an attachment.
Who needs it
Project owners or their representatives preparing a Stormwater Control Plan for a project in Carpinteria should use this template.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document has no notary block; its certification section does not identify a notarized attachment or related sworn step.
How to submit this form
- 1
Download The Template
Download the Stormwater Control Plan Template PDF.
- 2
Complete Project Information
Enter project data and describe the site, drainage design, stormwater controls, and maintenance approach.
- 3
Gather Attachments
Include the Stormwater Control Plan Exhibit and Stormwater Control Measures Sizing Calculator, as applicable.
- 4
Submit To The City
Submit the completed plan to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the Stormwater Control Plan Template for?
- It provides sections for project data, site conditions, drainage design, low-impact development strategies, source controls, facility maintenance, and certifications.
- Who uses this template?
- Project owners and their representatives use it to prepare a Stormwater Control Plan for a project.
- Do I need a notary for the Stormwater Control Plan Template?
- No. The document has no notary block and does not identify a notarized attachment or related sworn step.
- How do I submit the Stormwater Control Plan?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Stormwater Control Plan Template doesn’t need a notary — but if you have another Carpinteria form that does, a commissioned online notary can help.
