Voluntary Architectural Plan Release Form

Architects or designers use this form to authorize the City of Watsonville to copy and reproduce plans and project materials.

What this form is

This voluntary form authorizes the City of Watsonville to copy and reproduce submitted drawings and other project materials for regulatory, administrative, and legal functions, including public hearing materials and online posting. The form requests the property address, permit number, architect or designer’s printed name, signature, and date. Return it at least two weeks before the project’s first Planning Commission or City Council public hearing.

Who needs it

An architect or designer for a proposed project may complete this form to authorize the city’s use of submitted plans and materials.

How to submit it

Return the form to the Planning Department by mail at 250 Main Street, Watsonville, CA 95076, or email it to the project planner. Submit it at least two weeks before the first public hearing.

About notarization

This document is signed without a notary; the architect simply signs and dates the form, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Form

    Download the Voluntary Architectural Plan Release Form.

  2. 2

    Complete The Form

    Enter the property address and permit number, then provide the architect or designer’s printed name, signature, and date.

  3. 3

    Check For Attachments

    The form does not identify any attachments to include.

  4. 4

    Submit To The Planning Department

    Email the form to the project planner or mail it to the Planning Department at 250 Main Street, Watsonville, CA 95076, at least two weeks before the first public hearing.

Frequently asked questions

Do I need a notary for the Voluntary Architectural Plan Release Form?
No. The architect signs and dates the form; it identifies no notarized or sworn attachment.
Who completes this architectural plan release form?
The form is for the architect or designer of the referenced project. It asks for the property address, permit number, printed name, signature, and date.
How do I submit the Voluntary Architectural Plan Release Form?
Return it to the Planning Department at 250 Main Street, Watsonville, CA 95076, or email it to the project planner. The form says to submit it at least two weeks before the first public hearing.
What does the form authorize the city to do?
It authorizes the City of Watsonville to copy and reproduce submitted drawings and other project materials for regulatory, administrative, and legal functions, including public hearing materials and online posting.

Need something notarized?

This Voluntary Architectural Plan Release Form doesn’t need a notary — but if you have another Watsonville form that does, a commissioned online notary can help.