Braselton, GA · Barrow County

No notary required

Drinking Water Project Submittal Form

This form collects project, water system, and pressure/flow information from people submitting a proposed drinking water construction project for review.

What this form is

The form records general project details, proposed water connections and mains, wastewater handling, and pressure and flow information for a drinking water project. It also asks for a sketch showing fire hydrants used for testing and 24-hour pressure test results for projects connecting to existing systems. The form states that applicable approvals and permits must be obtained before construction starts.

Who needs it

A person submitting a drinking water construction project for approval completes the form with project, water system, and pressure/flow information.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the signer signs and dates the form, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Form

    Download the Drinking Water Project Submittal Form PDF.

  2. 2

    Complete Project Information

    Enter project, water system, development, connection, wastewater, and pressure/flow details.

  3. 3

    Gather Supporting Information

    Include a sketch of fire hydrants used for testing and distances from the connection point; include 24-hour pressure test results when connecting to an existing system.

  4. 4

    Sign And Date

    Provide the name, signature, title, and date requested on the form.

  5. 5

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What information does the Drinking Water Project Submittal Form request?
It asks for project and water system details, proposed connections and water mains, wastewater handling, pressure and flow information, and supporting materials identified on the form.
Do I need a notary for the Drinking Water Project Submittal Form?
No. The form has a signature and date line but no notary block; it identifies no notarized or sworn attachment.
How do I submit the Drinking Water Project Submittal Form?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Drinking Water Project Submittal Form doesn’t need a notary — but if you have another Braselton form that does, a commissioned online notary can help.