Braselton, GA · Barrow County
Sanitary Sewer Extension Submittal
Developers and their project teams use this submittal form to provide project and design information for a proposed sanitary sewer extension in Braselton.
What this form is
This form collects information about a proposed sanitary sewer extension, including the project, developer, engineer, service area, development type, design flows, and sewer infrastructure. It also requests supporting flow analysis and, when applicable, industrial wastewater details and pump station calculations. The developer must certify that the information is true and correct and that the proposed sewers will not serve structures on property used as a solid waste landfill.
Who needs it
Developers proposing a sanitary sewer extension in Braselton should complete the project information and provide the requested design details and supporting materials.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the developer certifies the information and signs and dates the form.
How to submit this form
- 1
Download The Form
Download the Sanitary Sewer Extension Submittal PDF.
- 2
Complete Project Details
Fill in the project, developer, engineer, service-area, development, population, flow, and sewer design information requested.
- 3
Gather Supporting Materials
Provide the requested downstream flow analysis and, when applicable, industrial wastewater details or pump station and force main calculations.
- 4
Sign And Submit
Have the responsible person certify, sign, and date the form, then submit it to the city department named on the form.
Frequently asked questions
- What information does the Sanitary Sewer Extension Submittal request?
- It asks for project, developer, engineer, service-area, development, population, flow, and sewer design information. It also requests supporting flow analysis and certain additional details or calculations when applicable.
- Who completes the sanitary sewer extension form?
- The form is for a proposed sewer extension project. It requests information from the developer and designing engineer, and includes a certification and signature section for the responsible person.
- Do I need a notary for the Sanitary Sewer Extension Submittal?
- No. The document has no notary block; the developer certifies the information and the responsible person signs and dates the form.
- How do I submit the Sanitary Sewer Extension Submittal?
- The form does not provide submission instructions. Submit it to the city department named on the form and check the city website for current contact details.
Need something notarized?
This Sanitary Sewer Extension Submittal doesn’t need a notary — but if you have another Braselton form that does, a commissioned online notary can help.
