Braselton, GA · Barrow County
Sub-Contractor Certification
Subcontractors use this certification to identify their trade responsibility and license for a job in Braselton before a permit is issued or work begins.
What this form is
This form certifies which electrical, plumbing, or HVAC work a subcontractor is responsible for and identifies the license being used for the job. The Town requires it before issuing a permit or starting work. It asks for the subdivision and lot, permit number if applicable, job site address, general contractor, license details, company information, and the subcontractor’s signature and date.
Who needs it
A subcontractor responsible for electrical, plumbing, or HVAC work must complete this form before a permit is issued or work begins.
How to submit it
Submit the signed form to the Planning and Development Department at 4982 Highway 53, Braselton, Georgia 30517. Faxed or emailed copies are acceptable.
About notarization
This document is signed without a notary; the signer just signs and dates it on the form.
How to submit this form
- 1
Download The Form
Download the Sub-Contractor Certification PDF.
- 2
Complete The Certification
Provide the job details, select the trade and license type, and enter the requested license and company information.
- 3
Sign And Date
Sign and date the form. A permit number may be left blank if the form is for a pending building or trade permit application.
- 4
Submit To The Department
Submit it to the Planning and Development Department before a permit is issued or work begins; faxed or emailed copies are acceptable.
Frequently asked questions
- Do I need a notary for the Sub-Contractor Certification?
- No. This form does not require notarization; the signer just signs and dates it on the form.
- How do I submit the Sub-Contractor Certification?
- Submit it to the Planning and Development Department at 4982 Highway 53, Braselton, Georgia 30517. The form says faxed or emailed copies are acceptable.
- When must I submit this certification?
- The form says it must be completed, signed, and submitted before a permit is issued or work begins.
- What information does the form request?
- It asks for job and contractor details, the trade and license type, license number, company contact information, and the subcontractor’s signature and date.
Need something notarized?
This Sub-Contractor Certification doesn’t need a notary — but if you have another Braselton form that does, a commissioned online notary can help.
