Sharpsburg, GA · Coweta County

No notary required

Application for Authorization to Construct Sign

Property owners or sign applicants use this application to request authorization to construct a sign and provide sign and site details for review.

What this form is

This application requests authorization to construct a sign and states that sign construction is subject to the sign ordinance. It asks for owner, contractor, property, business, and sign details, plus signatures and dates. Applicants must submit a scaled sign plan with sizing calculations and construction details, along with a scaled site drawing showing relevant features; submitting the application and review fee does not constitute approval.

Who needs it

A property owner or applicant seeking authorization to construct a sign should complete this application and provide the required plans and site drawing.

How to submit it

Submit the application with the required scaled sign and site drawings and payment of the review fee. The form does not name a submission department or address; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the required sign plans, calculations, construction details, and site drawing are not described as sworn or notarized.

How to submit this form

  1. 1

    Download The Application

    Download the Application for Authorization to Construct Sign PDF.

  2. 2

    Complete The Application

    Enter the owner, contractor if applicable, property, business, and sign information; sign and date the application.

  3. 3

    Prepare The Required Drawings

    Attach the scaled sign plans, sizing calculations, construction details, and scaled site drawing described on the form.

  4. 4

    Submit The Application

    Submit the application and drawings with payment of the review fee; check the city website for current submission contact details.

Frequently asked questions

Do I need a notary for the sign construction application?
No. The application has signature and date lines but no notary block. The required sign plans, calculations, construction details, and site drawing are not described as sworn or notarized.
How do I submit the sign construction application?
Submit the application with the required scaled sign and site drawings and payment of the review fee. The form does not provide a submission address or department, so check the city website for current contact details.
What plans must accompany the application?
Submit an 8½-by-11-inch sheet with a scaled drawing of the sign plans, complete sign sizing calculations and construction details, and a scaled site drawing showing driveways, structures, sign locations, and other significant features as needed.
Does submitting the application mean the sign is approved?
No. The form says submitting the application and paying the review fee does not constitute approval. It says the applicant will be contacted within 45 days regarding approval or denial.

Need something notarized?

This Application for Authorization to Construct Sign doesn’t need a notary — but if you have another Sharpsburg form that does, a commissioned online notary can help.