Residential Demolition Application Procedures

This document includes a utility verification checklist for owners or contractors applying for a residential demolition permit in Rome.

What this form is

This document includes a utility verification checklist to submit with a Demolition Permit application for residential demolition in Rome. The city requires documentation from all utilities before it can issue the permit, and the document states that a $98 permit fee is due with the application. The checklist asks for the site address, demolition scope, proposed date, owner and contractor details, and a signed confirmation about utilities and calling 811.

Who needs it

Owners or contractors planning residential demolition in Rome need the checklist and must submit it with a Demolition Permit application.

How to submit it

The document directs applicants to email the application to [email protected] and [email protected]. It states that the $98 permit fee is due when applying.

About notarization

This document does not require notarization; the applicant signs and dates the utility checklist, and no sworn or notarized attachment is identified.

How to submit this form

  1. 1

    Download The Checklist

    Download the Residential Demolition Application Procedures PDF and review its utility verification checklist.

  2. 2

    Complete The Checklist

    Provide the site and contact information, select the demolition scope, enter the proposed date, and sign and date the utility confirmation.

  3. 3

    Gather Utility Documentation

    Confirm utilities have been removed and call 811 for location services; the city requires documentation from all utilities.

  4. 4

    Submit To The City

    Email the application to [email protected] and [email protected]. The document says the $98 permit fee is due at application.

Frequently asked questions

Do I need a notary for the Residential Demolition Application Procedures?
No. The checklist is signed and dated by the applicant, and the document does not identify a sworn or notarized attachment.
How do I submit the residential demolition checklist?
Email the application to [email protected] and [email protected], as directed in the document. The $98 permit fee is due when applying.
What information does the utility checklist request?
It asks for the site address, demolition scope and proposed date, owner and contractor contact details, and a signed confirmation about utility removal and calling 811.
What utility documentation is needed for a demolition permit?
The document says the Building Inspection Department requires documentation from all utilities before the permit can be issued.