East Point, GA · Fulton County

No notary required

Tree Permit Application

Property owners and tree contractors use this application to request approval for tree removal at a residential or commercial project address.

What this form is

This application requests a tree removal permit and identifies the project address, removal scope, permit holder, property owner, and any contractor or agent. For one to five trees, it calls for photos showing each tree’s diameter measurement; for six or more trees, it requires plan review and an arborist report and site plan. The application is not a permit until fees are received and applicable plans are approved.

Who needs it

A property owner or tree contractor planning tree removal at a residential or commercial address in East Point needs to complete this application.

How to submit it

Complete and submit the application through the BS&A Online Permitting Portal at https://bsaonline.com/?uid=2757. Include the required supporting documents and applicable fee.

About notarization

This document is signed and dated without a notary; it requires no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Tree Permit Application PDF.

  2. 2

    Complete The Application

    Enter the project address, removal scope, and required permit holder, property owner, and applicant information; sign and date the form.

  3. 3

    Gather Required Attachments

    Add tree photos for one to five trees, or the required arborist report and site plan for six or more trees, along with applicable credentials.

  4. 4

    Submit Through The Portal

    Submit the application, attachments, and applicable fee through the BS&A Online Permitting Portal listed on the form.

Frequently asked questions

Do I need a notary for the Tree Permit Application?
No. The document is signed and dated without a notary and lists no notarized or sworn attachment.
How do I submit the Tree Permit Application?
Submit the completed application and required supporting documents through the BS&A Online Permitting Portal listed on the form.
What supporting documents does the application require?
For one to five trees, submit photos showing each tree’s diameter measurement. For six or more trees, submit an arborist report and a site plan with tree types, diameters, and erosion-control method.
Does submitting the application mean I can start work?
No. The form says the application is not a permit until fees are received and applicable drawings or plans are approved. Work before permit issuance is prohibited.