Sandy Springs, GA · Fulton County
Green Infrastructure Feasibility Form for Linear Projects
Design professionals use this form to document whether a linear development project can meet the runoff reduction standard with on-site green infrastructure.
What this form is
This form documents the runoff reduction requirements for a development and supports a request for a Determination of Infeasibility. It asks for site details and runoff reduction information, and includes a checklist of required supporting documentation, site conditions, and practicality analyses. The completed, signed, and sealed form must be included in the submittal package for the determination.
Who needs it
A design professional preparing a linear development project’s request for a Determination of Infeasibility completes and signs this form.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This form does not require notarization; the design professional signs and seals it, and the form is dated.
How to submit this form
- 1
Download The Form
Download the Green Infrastructure Feasibility Form for Linear Projects PDF.
- 2
Complete The Form
Enter the site details and runoff reduction information, and check applicable site conditions.
- 3
Gather Supporting Documents
Include the listed plans, analyses, reports, and other documentation relevant to the site conditions and request.
- 4
Sign And Submit
Have the design professional sign and seal the completed form, then submit it with the package for a Determination of Infeasibility.
Frequently asked questions
- What is the Green Infrastructure Feasibility Form for Linear Projects?
- It documents runoff reduction information and supporting evidence for a request for a Determination of Infeasibility for a development project.
- What must be included with this form?
- The form lists a stormwater concept plan, soil documentation, a signed and sealed analysis, applicable site-condition documentation, and practicality analyses among the required items.
- Do I need a notary for the Green Infrastructure Feasibility Form?
- No. The form does not require notarization; the design professional must sign and seal it, and the form is dated.
- How do I submit the Green Infrastructure Feasibility Form?
- Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Green Infrastructure Feasibility Form for Linear Projects doesn’t need a notary — but if you have another Sandy Springs form that does, a commissioned online notary can help.
