Sandy Springs, GA · Fulton County

No notary required

Green Infrastructure Feasibility Form for Linear Projects

Design professionals use this form to document whether a linear development project can meet the runoff reduction standard with on-site green infrastructure.

What this form is

This form documents the runoff reduction requirements for a development and supports a request for a Determination of Infeasibility. It asks for site details and runoff reduction information, and includes a checklist of required supporting documentation, site conditions, and practicality analyses. The completed, signed, and sealed form must be included in the submittal package for the determination.

Who needs it

A design professional preparing a linear development project’s request for a Determination of Infeasibility completes and signs this form.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This form does not require notarization; the design professional signs and seals it, and the form is dated.

How to submit this form

  1. 1

    Download The Form

    Download the Green Infrastructure Feasibility Form for Linear Projects PDF.

  2. 2

    Complete The Form

    Enter the site details and runoff reduction information, and check applicable site conditions.

  3. 3

    Gather Supporting Documents

    Include the listed plans, analyses, reports, and other documentation relevant to the site conditions and request.

  4. 4

    Sign And Submit

    Have the design professional sign and seal the completed form, then submit it with the package for a Determination of Infeasibility.

Frequently asked questions

What is the Green Infrastructure Feasibility Form for Linear Projects?
It documents runoff reduction information and supporting evidence for a request for a Determination of Infeasibility for a development project.
What must be included with this form?
The form lists a stormwater concept plan, soil documentation, a signed and sealed analysis, applicable site-condition documentation, and practicality analyses among the required items.
Do I need a notary for the Green Infrastructure Feasibility Form?
No. The form does not require notarization; the design professional must sign and seal it, and the form is dated.
How do I submit the Green Infrastructure Feasibility Form?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Green Infrastructure Feasibility Form for Linear Projects doesn’t need a notary — but if you have another Sandy Springs form that does, a commissioned online notary can help.