Sandy Springs, GA · Fulton County

No notary required

Green Infrastructure Feasibility Form for Non-Linear Projects

Design professionals complete and submit this form to document runoff reduction feasibility for non-linear development projects in Sandy Springs.

What this form is

This form documents a non-linear development project's runoff reduction requirements and whether green infrastructure practices are feasible. The document says all development projects must submit the completed form and a Stormwater Concept Plan. Requests for a Determination of Infeasibility also require supporting documentation, such as soil assessments, site plans, or analyses, depending on the site's conditions.

Who needs it

Design professionals for development projects complete this form, and those requesting an infeasibility determination provide the listed supporting documentation.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

The design professional signs and seals this form without a notary; the document does not identify any notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Form

    Download the Green Infrastructure Feasibility Form for Non-Linear Projects.

  2. 2

    Complete The Form

    Enter project and runoff reduction information, check applicable site conditions, and have the design professional sign and seal the form.

  3. 3

    Gather Required Documents

    Include a Stormwater Concept Plan. For an infeasibility determination, include the supporting documentation required for the request and applicable site conditions.

  4. 4

    Submit To The City

    Submit the completed form and required materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Green Infrastructure Feasibility Form document?
It records runoff reduction information for a development project and whether green infrastructure practices are feasible or infeasible.
Who completes this form?
The form is completed, signed, and sealed by the project's design professional. All development projects must submit it with a Stormwater Concept Plan.
Do I need a notary for the Green Infrastructure Feasibility Form?
No. The design professional signs and seals the form without a notary; the document does not identify any notarized attachment or sworn step.
How do I submit the Green Infrastructure Feasibility Form?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Green Infrastructure Feasibility Form for Non-Linear Projects doesn’t need a notary — but if you have another Sandy Springs form that does, a commissioned online notary can help.