South Fulton, GA · Fulton County

No notary required

Engineer’s As-Built Detention Certification Form

Registered professional engineers use this form to certify detention facility construction and provide as-built pond measurements for a South Fulton project.

What this form is

The form records a registered professional engineer’s certification that a detention facility was built to permitted plans and meets stated performance conditions. It asks for project identifiers, pond field measurements, water-surface elevations, storage volumes, spillway details, and the engineer’s signature, date, seal, and registration number. The form does not state when submission is required or provide a submission destination.

Who needs it

A registered professional engineer certifying an as-built detention facility for a South Fulton project needs to complete and sign this form.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This form is signed and sealed without a notary; the engineer certifies the measurements and signs and dates the form.

How to submit this form

  1. 1

    Download The Form

    Download the Engineer’s As-Built Detention Certification Form.

  2. 2

    Complete The Project Details

    Enter the project identifiers and provide the requested as-built pond field measurements.

  3. 3

    Sign And Seal The Form

    The registered professional engineer signs and dates the certification and provides a Georgia P.E. registration number.

  4. 4

    Submit To The City

    Submit the form to the city department named on it; check the city website for current contact details.

Frequently asked questions

What does the Engineer’s As-Built Detention Certification Form certify?
A registered professional engineer certifies that the detention facility conforms to permitted plans and specifications and that the pond meets stated performance conditions.
What information does the form ask for?
It asks for project identifiers and field measurements, including pond dimensions, elevations, storage volumes, spillway types, outlet details, and the engineer’s signature and registration number.
Do I need a notary for the Engineer’s As-Built Detention Certification Form?
No. The engineer signs and seals the form and provides a date; the document does not include a notary jurat or acknowledgment.
How do I submit the Engineer’s As-Built Detention Certification Form?
Submit it to the city department named on the form; check the city website for current contact details, since the document does not list a submission destination.

Need something notarized?

This Engineer’s As-Built Detention Certification Form doesn’t need a notary — but if you have another South Fulton form that does, a commissioned online notary can help.