Union City, GA · Fulton County
Right-of-Way Permit Application
This application is for applicants seeking a Union City permit for construction, excavation, or other work in the right-of-way.
What this form is
Use this application to request a permit for proposed construction, excavation, or other work activity in the right-of-way. It asks for applicant, project manager, and contractor details, the work location and description, installation type, and the requested start date. Applicants must attach an engineered drawing with specified site, equipment, right-of-way, and lane closure details when applicable.
Who needs it
Applicants proposing construction, excavation, or other work activity in the right-of-way should complete this application.
How to submit it
Upload the completed form at https://unioncityga.portal.iworq.net/portalhome/unioncityga and make payment online when submitting at https://unioncityga.governmentwindow.com/payer_login.html.
About notarization
This application is signed and dated without a notary; the required engineered drawing attachment is not identified as needing notarization or a sworn statement.
How to submit this form
- 1
Download The Application
Download the Right-of-Way Permit Application PDF.
- 2
Complete The Form
Fill out the form completely, including applicant and contractor details, work location, installation type, and proposed work description.
- 3
Attach The Engineered Drawing
Attach an engineered drawing with a scale and legend and the details listed on the form, including lane closure plans when applicable.
- 4
Sign And Submit
Sign and date the application, upload it through the listed Union City portal, and make payment online when submitting.
Frequently asked questions
- What is the Right-of-Way Permit Application for?
- It requests a permit for proposed construction, excavation, or other work activity in the right-of-way and collects project and applicant information.
- What attachment does the application require?
- Attach an engineered drawing with a scale and legend. The form lists details to show, including street names, right-of-way lines, a site location map, and lane closure plans when applicable.
- How do I submit the application?
- Upload the completed form through the Union City portal listed in the instructions. The form also instructs applicants to make payment online when submitting the application.
- Do I need a notary for this application?
- No. The application has an applicant signature and date line but no notary block. The required engineered drawing is not identified as needing notarization or a sworn statement.
Need something notarized?
This Right-of-Way Permit Application doesn’t need a notary — but if you have another Union City form that does, a commissioned online notary can help.
