Dacula, GA · Gwinnett County
Small Wireless Facilities Permit Application
Wireless providers or their designated applicants use this application to request a Dacula permit for small wireless facilities or related poles in the public right of way.
What this form is
Dacula requires this application to request a permit to collocate a small wireless facility in the public right of way, or to install, modify, or replace a pole there for collocation. The form asks for applicant and consultant contacts, work location and scope, pole counts, footage, and project dates. Applicants must attach construction drawings, a structural report for collocation, visual depictions when needed, facility locations, and proof of annual payment setup.
Who needs it
A wireless provider or third-party applicant seeking to collocate a small wireless facility or install, modify, or replace a qualifying pole in Dacula’s public right of way needs this application.
How to submit it
Submit the application to the City of Dacula Planning and Development Department at 442 Harbins Rd., P.O. Box 400, Dacula, GA 30019. The form lists application fee calculations for collocations, replacement poles, and new poles.
About notarization
This application has no notary block; no notarized or sworn attachment is listed, so the applicant and witness sign and date it.
How to submit this form
- 1
Download The Application
Download the Small Wireless Facilities Permit Application PDF.
- 2
Complete The Application
Provide applicant and consultant contact details, work location and scope, pole counts, footage, and project dates.
- 3
Gather Required Attachments
Attach construction drawings, any required structural report and visual depictions, facility locations, and proof of annual payment setup.
- 4
Sign And Submit To The City
Have the applicant and witness sign and date the application, then submit it to the Planning and Development Department.
Frequently asked questions
- What does the Small Wireless Facilities Permit Application cover?
- It requests a permit to collocate a small wireless facility in Dacula’s public right of way or to install, modify, or replace a pole there for collocation.
- What attachments does the application require?
- The form lists detailed construction drawings, a structural report for collocation, visual depictions when not included in the drawings, facility locations relative to right-of-way boundaries, and proof of annual payment setup.
- Do I need a notary for the Small Wireless Facilities Permit Application?
- No. The application has no notary block, and it lists no notarized or sworn attachment. The applicant and witness sign and date it.
- How do I submit the Small Wireless Facilities Permit Application?
- Submit it to Dacula’s Planning and Development Department at 442 Harbins Rd., P.O. Box 400, Dacula, GA 30019.
Need something notarized?
This Small Wireless Facilities Permit Application doesn’t need a notary — but if you have another Dacula form that does, a commissioned online notary can help.
