As-Built Detention Facility Certification
A registered professional engineer completes this certification to attest that a project’s detention facility was built and functions according to the permitted plans and city requirements.
What this form is
A registered professional engineer uses this certification to attest that a project’s detention facility conforms to permitted plans and specifications and meets the City of Locust Grove’s requirements. The form identifies the project and LDP number, records field measurements and pond characteristics, and includes the engineer’s signature, seal, and registration number.
Who needs it
A registered professional engineer completing the certification for a detention facility in Locust Grove should provide the project details and required field measurements.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This certification is signed and sealed by a registered professional engineer, not notarized; it records the field-measurement date and mentions no sworn attachment.
How to submit this form
- 1
Download The Certification
Download the As-Built Detention Facility Certification PDF.
- 2
Complete Project Details
Enter the project name, LDP number, land lot information, and field-measurement date.
- 3
Record Facility Measurements
Provide the listed pond, outlet, water-surface, spillway, and elevation measurements.
- 4
Sign And Seal
Have the registered professional engineer sign and seal the certification and provide the Georgia P.E. registration number.
- 5
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What does the As-Built Detention Facility Certification document?
- It certifies that a project’s detention facility was constructed according to permitted plans and specifications, functions according to city requirements, and meets the stated discharge and downstream conditions.
- Who completes the detention facility certification?
- A registered professional engineer completes the certification, provides the project and LDP details, records field measurements and pond data, and signs and seals the form.
- Do I need a notary for the As-Built Detention Facility Certification?
- No. The form calls for a registered professional engineer’s signature and seal, not notarization. It records the field-measurement date and mentions no sworn attachment.
- How do I submit the As-Built Detention Facility Certification?
- The form does not provide submission instructions or contact details. Submit it to the city department named on the form; check the city website for current contact details.