Heating and Air Conditioning Permit

This permit form is for property owners and mechanical contractors seeking approval for heating or air conditioning equipment installation, replacement, or repair.

What this form is

The form covers heating and refrigeration equipment, grease hoods, and gas piping for HVAC work in Walnut Grove. It asks for the job address, owner and contractor details, equipment specifications, and signatures; the document says commercial buildings using non-residential heating equipment require plans.

Who needs it

Property owners and mechanical contractors need this form for heating or air conditioning equipment installation, replacement, or repair.

How to submit it

Obtain the permit from the Code Enforcement Office at least four hours before HVAC work begins. Make checks payable to the City of Walnut Grove and notify the city when the job is ready for inspection.

About notarization

This document is signed without a notary; the applicant and contractor sign, and no notarized attachment or sworn step is stated.

How to submit this form

  1. 1

    Download The Permit

    Download the Heating and Air Conditioning Permit PDF.

  2. 2

    Complete The Form

    Enter the job, owner, contractor, and equipment information, then have the applicant and contractor sign.

  3. 3

    Gather Required Plans

    For commercial buildings using non-residential heating equipment, the city requires plans.

  4. 4

    Obtain The Permit

    Obtain the permit from the Code Enforcement Office at least four hours before HVAC work begins.

Frequently asked questions

What does the Heating and Air Conditioning Permit cover?
It covers installation, replacement, or repair of equipment and asks for information about heating and refrigeration units, grease hoods, and gas piping.
Do I need a notary for the Heating and Air Conditioning Permit?
No. The applicant and contractor sign the form; it does not state that an attachment or related step must be notarized or sworn.
How do I submit the Heating and Air Conditioning Permit?
Obtain it from the Code Enforcement Office at least four hours before HVAC work begins. Make checks payable to the City of Walnut Grove and notify the city when the job is ready for inspection.