Commercial and industrial property owners or contractors use this application to request a building permit from the City of Flora.

What this form is

The City of Flora requires this application before it can issue a commercial or industrial building permit. It asks for owner and contractor contact details, project cost, and site-plan measurements; applicants must also provide a site plan, zoning certificate, and required building drawings and supporting documents.

Who needs it

Property owners and contractors planning commercial or industrial construction in Flora need to complete this application before a permit can be issued.

How to submit it

Complete and return the application to Chad Bayles, Building Official/Code Enforcement, 131 E 2nd Street, PO Box 249, Flora, IL 62839. Permit fees are determined after application approval.

About notarization

This document is signed and dated without a notary; it mentions no attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download the Application

    Download the commercial-industrial building permit application PDF.

  2. 2

    Complete the Application

    Provide the owner and contractor information, estimated project cost, and site-plan measurements requested on the form.

  3. 3

    Gather Required Documents

    Prepare the site plan, certificate of compliance, building drawings, and other documents listed in the permit requirements.

  4. 4

    Return It to the City

    Return the completed application to Chad Bayles, Building Official/Code Enforcement, at the address printed on the form.

Frequently asked questions

Do I need a notary for the Commercial-Industrial Building Permit Application?
No. This application is signed and dated without a notary, and the document does not identify any attachment or related step that must be notarized or sworn.
How do I submit the commercial-industrial building permit application?
Return it to Chad Bayles, Building Official/Code Enforcement, at 131 E 2nd Street, PO Box 249, Flora, IL 62839.
What documents are required with the application?
The document lists a site plan with utility locations, a certificate of compliance from the zoning administrator, and building drawings and supporting documents for consideration.
When are permit fees determined?
The document says permit fees are determined after the application is approved, and the requirements section says fees are determined after application review.