River Grove, IL · Cook County

No notary required

Plumbing Permit Application

River Grove homeowners or contractors use this application to request a permit for plumbing work at a property.

What this form is

This application requests a River Grove plumbing permit and collects owner, contractor, and project details, including the work description, fixture count, and work valuation. The form says a letter of intent and contracts or receipts are required for all projects; a separate right-of-way permit is also required. The signer agrees to follow the permitting process and acknowledges alley protection guidelines.

Who needs it

A property owner or contractor planning plumbing work in River Grove should complete this application for the project.

How to submit it

The form lists the Building Department at 2621 Thatcher Ave, River Grove, Illinois 60171, and [email protected]. It does not specify a submission method.

About notarization

This document is signed without a notary; the contractor or homeowner signs and dates the application and the alley protection acknowledgment.

How to submit this form

  1. 1

    Download The Application

    Download the Plumbing Permit Application PDF.

  2. 2

    Complete The Form

    Enter the property owner, contractor, and project information, then sign and date the form.

  3. 3

    Gather Required Items

    Include a letter of intent and contracts or receipts; obtain a separate right-of-way permit if required for the project.

  4. 4

    Contact The Building Department

    Use the Building Department address or email listed on the form to ask how to submit the application.

Frequently asked questions

Who uses the River Grove Plumbing Permit Application?
Property owners or contractors use the application to provide owner, contractor, and project information for plumbing work in River Grove.
What attachments does the application require?
The form says a letter of intent and contracts or receipts are required for all projects. It also states that a separate right-of-way permit is required in addition to the plumbing permit.
Do I need a notary for the River Grove Plumbing Permit Application?
No. This document is signed without a notary; the contractor or homeowner signs and dates the application and the alley protection acknowledgment.
How do I submit the plumbing permit application?
The form lists the Building Department at 2621 Thatcher Ave, River Grove, Illinois 60171, and [email protected], but does not specify a submission method.

Need something notarized?

This Plumbing Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.