Fountain Permit
Property owners and contractors submit this permit package to the Village of South Barrington for installation of a freestanding fountain.
What this form is
The Village of South Barrington requires this permit for installation of a freestanding fountain. The submittal includes a permit application, two sets of plans, a plat of survey, an as-built septic system plan, a contract or proposal, and subdivision HOA architectural approval. The document also lists location criteria, application and plan review fees, and a performance deposit required when the permit is issued.
Who needs it
Property owners and contractors planning to install a freestanding fountain in South Barrington need to submit the required permit materials.
How to submit it
Email a complete, unrestricted PDF submittal to [email protected] and provide a hard copy of all documents to the Village at 30 S. Barrington Road, South Barrington, IL 60010. The document lists a $100 application fee and a $132.50 plan review deposit; no credit cards.
About notarization
This permit document has no notary block; it lists no sworn or notarized attachment and does not specify a signature or date requirement.
How to submit this form
- 1
Download The Permit
Download the Fountain Permit PDF and obtain the Permit Application Form listed on the Village website under Government, Building & Engineering.
- 2
Prepare The Submittal
Gather two sets of fountain plans, a plat of survey, an as-built septic system plan, a contract or proposal, and an HOA architectural approval letter.
- 3
Submit The Documents
Email a complete, unrestricted PDF submittal to [email protected] and provide a hard copy of all documents to the Village.
- 4
Include The Listed Fees
The document lists a $100 application fee and a $132.50 plan review deposit; it states that credit cards are not accepted.
Frequently asked questions
- What is the Fountain Permit for?
- It covers permit submittals for installing a freestanding fountain in South Barrington and lists required application materials and location criteria.
- What materials are required with the fountain permit?
- The document lists a permit application, two sets of plans, a plat of survey, an as-built septic system plan, a contract or proposal, and an HOA architectural approval letter.
- Do I need a notary for the Fountain Permit?
- No. The document has no notary block and lists no sworn or notarized attachment; it does not specify a signature or date requirement.
- How do I submit the Fountain Permit?
- Email a complete, unrestricted PDF submittal to [email protected] and provide a hard copy of all documents to the Village at 30 S. Barrington Road.