Farmer City, IL · DeWitt County

No notary required

Right-of-Way Permit Application

Utilities, contractors, homeowners, and other applicants use this application to request a permit for work in Farmer City streets or other public rights-of-way.

What this form is

Use this application to request a permit for tunneling, boring, excavating, digging, or similar work in a city street, alley, sidewalk, terrace, or other public right-of-way. It asks for applicant and utility details, the work location and schedule, a work description, and traffic-control information. The form also lists plans, drawings, proof of insurance, and proof of a security fund among the applicable attachments.

Who needs it

Utilities, contractors, homeowners, and other applicants planning work in a Farmer City street, alley, sidewalk, terrace, or other public right-of-way need this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the applicant signs and dates the application, with no notarized attachment identified.

How to submit this form

  1. 1

    Download The Application

    Download the Farmer City Right-of-Way Permit Application PDF.

  2. 2

    Complete The Application

    Provide applicant and utility details, the work location and schedule, a work description, and traffic-control information.

  3. 3

    Gather Attachments

    Include applicable plans and drawings, proof of insurance naming the City as an additional insured, and proof of posting a security fund.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the ROW Permit Application?
No. The application has an applicant signature and date, but no notary block. The form lists attachments, and none is identified as requiring notarization.
How do I submit the ROW Permit Application?
Submit it to the city department named on the form; check the city website for current contact details. The document does not provide a submission address or method.
What attachments does the application list?
The form lists applicable emergency contingency and traffic-control plans, drawings showing proposed work, proof of insurance naming the City as an additional insured, and proof of posting a security fund.
How long is the permit valid?
The form states that the permit is valid for six months from the date of approval.

Need something notarized?

This Right-of-Way Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.